
Technical Installation Guide (4G) v1.9
www.mobileye.com
14
Mobileye 8 Connect
5.4.3 Ferrite for Power Sources -Model 1 (ITM000777)
5.4.4 Instructions for power sources (CAB000371)
Please follow the instructions bellow for the two ferrites installation:
1.
Open the Ferrite using a small flat screwdriver.
2.
Place both Mobileye
BAT+
wire and
Ignition
wire
(CAB000371) together inside the first Ferrite.
3.
L
ocate the Ferrite 5cm from the Mobileye CAB000371
label
4.
Wrap the
BAT+
and
Ignition
wires through the Ferrite 4
times
and
around the outside of the Ferrite 3 times, as
shown in the figures
5.
Lock the Ferrite
6.
Open the second Ferrite using the supplied Key or small
flat screwdriver
7.
Place the Mobileye GND wire in the second Ferrite (
locate
the Ferrite filters 5cm from the Mobileye CAB000371
label).
8.
Wrap the GND wire through the Ferrite 4 times and
around the outside of the Ferrite 3 times, as shown in the figures
9.
Close the Ferrite
The Ferrite size and shape may vary different between different Ferrite models.
Ferrite installation on power lines are mandatory in CE marking countries.
Ferrite installations are not mandatory for FCC and E-Mark certificates.