Mobilex P05 Скачать руководство пользователя страница 4

Mobilex A/S
Grønlandsvej 5
DK-8660 Skanderborg
www.mobilex.dk

Make sure the inflation tubes are not kinked or tucked under the pad. 

Before inserting the plug into the outlet, make sure the voltage is compatible.

Plug the power cord into an electrical outlet with grounded AC power. If the power cord has
a grounding wire with a grounding pin, then this three-wire plug must be plugged properly
into an outlet and grounded as shown in the figure in the “Grounding description” section. 

Make sure this product is well grounded.

Make sure to disconnect the pump by unplugging the power cord when it is not in use.

Grounding description

This product should be grounded when it is equipped with a cord that contains a grounding wire
with a  grounding  plug.  In the  event  of  an  electrical  short  circuit,  grounding  reduces  the  risk  of
electric shock by providing an escape wire for the electric current.  

Improper use of the grounding plug can result in a risk of electric shock.

 

Check with a qualified electrician or serviceman if the grounding  instructions  are not completely
understood, or if in doubt as to whether the product is properly grounded. 
If it is necessary to use an extension cord, use only a 3-wire extension cord that has a three-blade 
grounding plug and a 3-slot receptacle that will accept the plug on the product. Replace or repair if 
damaged. 

Function description

Turn on the power by pressing the power switch at the right side of the pump. The indicator
of the power switch will come on. The pump starts to pump air into the mattress pad.

For time-saving in the first inflation, turn the pressure knob to the full Firm / Hard position. It 
requires approximately 10 minutes for a bubble pad to be fully inflated. 

When   mattress   pad   is   fully   inflated   turn   the   pressure-adjust   knob   to   set   a   comfortable
pressure level from soft to firm according to patient’s weight and comfort.

It is recommended that the pressure-adjust knob being turned to Firm when the bubble pad
is  firstly  inflated.  Users  can  then  easily  adjust  the  pressure  level  of  the  bubble  pad  to a
desired   firmness   by   themselves   or   according   to   the   suggestion   from   a   health   care
professional. 

If the pressure is consistently low, check for any leakage occurring in inflation tubes. Contact
your local dealer for replacement of any damaged tubes.

The deflating/inflating cycle runs automatically, when pump is turned on.

Transport recommendations 

The   device   was   not   designed   for   frequent   transportation.   If   it   is   necessary   to   transport   it,   we
recommend to disassemble it in the way opposite to the assembly description from above. Device
should packed in the way that it is stable and there is no risk of sudden and dangerous movements
of the transported device.

Accessories

There are no accessories provided for this device

4. Technical data

Pump P05

Specification 

Dimensions

27,5 x 10 x 10 cm

Weight

1.1 kg

Pressure Range

70 ~ 130 mmHg 

Cycle Time

12 min

Mattress Pad

Description

Dimensions

Material

Min./Max. Load

801

Bubble pad w/positioning extension 

200×90×6 cm

PVC 0.3 mm

20 kg /130 kg

Rev. 12/15

Page 4 of 6

UM-270016-GB

Содержание P05

Страница 1: ...dsvej 5 DK 8660 Skanderborg www mobilex dk Anti decubitus Mattress type ARIA with pump P05 Users manual Manufacturer MOBILEX A S Grønlandsvej 5 DK 8660 Skanderborg Denmark www mobilex dk Rev 12 15 Page 1 of 6 UM 270016 GB ...

Страница 2: ...ly use the product in flawless condition If defects or errors are detected you must immediately contact the dealer Follow the information on the product label Only use the product for the described purpose Avoid making constructive changes on the device unless you have the manufacturer s written acceptance for such modifications The device must only be used on beds equipped with regular mattresses...

Страница 3: ...on Tubes 1 User manual P05 compressor pump Assembly description With looking on the picture above the device should be assembled in quite instinctive way We recommend you to follow below steps In the first place take all elements out of the box and check with the list from above if nothing is missing If you d discover at that stage that some part is missing or damaged do not continue assembly proc...

Страница 4: ...the pump The indicator of the power switch will come on The pump starts to pump air into the mattress pad For time saving in the first inflation turn the pressure knob to the full Firm Hard position It requires approximately 10 minutes for a bubble pad to be fully inflated When mattress pad is fully inflated turn the pressure adjust knob to set a comfortable pressure level from soft to firm accord...

Страница 5: ...p DO NOT use a Hypocarbonate or Phenolic based cleaning solution as this may cause damage to the case Allow the solution to incubate for 10 minutes or accordingly as stated by the cleaning product used Spray cloth with cleaning solution and clean faceplate DO NOT allow excess cleaning solution on faceplate or control panel If solution gets inside damage will occur Allow surface to thoroughly dry a...

Страница 6: ... the tubes if there is any leakage 7 Disposal of the product The product can not be disposed of with household waste but must be brought to the local recycling centre Follow the national requirement to dispose the pump It should be delivered to the deposit station for re use or recycling 8 Guarantee terms Mobilex A S offers guarantee by errors in production It is 2 years of warranty for pumps prod...

Отзывы: