The motor controller is used to give the machine a soft start, control the
speed, protect the motor against overload and to indicate certain faulty
conditions on the machine.
1.
Programming
The Yaskawa 1.5kW controller has a large number of
programmable parameters affecting its operation, each with a
factory default value. Some of these parameters have been
changed from the default values as indicated below. To change
any parameter value proceed as follow:
With the machine stationary, press the “V” key once. The
digital operator shows the parameter menu (PAR) then press
“ENTER” key. Press the “>” key to select the digit/parameter
you would like to change. Next use the “
Ʌ
” and “V” keys to
select the parameter group, sub-group or number. Modify the
parameter value using the “
Ʌ
” and “V” key and press the
“ENTER” key to save the new value.
2.
Basic operation
The motor speed is set as follows:
To adjust the speed, which is displayed in
frequency
units “Hz”,
adjust the “SPEED” knob in the orange control box marked zero
to ten.
Max. possible speed is set at 48 Hz, at which speed exactly 2
wheels per sec. passes a fixed point (7200 wheels per hour). If
you try to adjust the speed higher than 48Hz the display will
flash and go back to the previous saved value. When the light at
the LO/RE key is on (local/remote) then it is possible to run and
stop the machine by the “RUN” and “STOP” keys on the
controller itself. If the light is off then it is only possible by the
green and red buttons on the outside of the control unit.
Содержание MMLS3
Страница 7: ...MLS Test Systems Pty Ltd Revised April 2013 5...
Страница 12: ...MLS Test Systems Pty Ltd Revised April 2013 10...
Страница 13: ...MLS Test Systems Pty Ltd Revised April 2013 11...
Страница 16: ...MLS Test Systems Pty Ltd Revised April 2013 14...
Страница 19: ...MLS Test Systems Pty Ltd Revised April 2013 17...
Страница 24: ...MLS Test Systems Pty Ltd Revised April 2013 22...
Страница 26: ...MLS Test Systems Pty Ltd Revised April 2013 24...
Страница 42: ...MLS Test Systems Pty Ltd Revised April 2013 40 APPENDIX D Circuit diagrams...
Страница 43: ...MLS Test Systems Pty Ltd Revised April 2013 41...
Страница 44: ...MLS Test Systems Pty Ltd Revised April 2013 42...
Страница 45: ...MLS Test Systems Pty Ltd Revised April 2013 43...
Страница 46: ...MLS Test Systems Pty Ltd Revised April 2013 44...
Страница 48: ...MLS Test Systems Pty Ltd Revised April 2013 46...