MLS Test Systems Pty Ltd
Revised: April 2013
1
SECTION 1: UNPACKING AND INSPECTION
1.1
Packing list
You should have received the following items
1.
The MMLS3 machine frame plus the following accessories:
a.
One steerable “jockey wheel” and two fixed transport
castors wheels. (See Fig.1(h).
b.
Two “skate boards” with base plates (See Fig.1(g))
c.
Two link arms, about 350mm long, to link the machine
to the base plates (See fig. 4)
2.
An “electric orange” control box
3.
An electronic calibration unit to set the wheel load (See Fig.3).
This is packed in a wooden box, about 400x300x300mm.
4.
One spare pneumatic wheel, complete with bearings and shaft.
5.
Eight spare yellow guide wheels
6.
The following metric tools
a.
10mm wrench
b.
13mm wrench
c.
16mm wrench
d.
17mm wrench
e.
14mm wrench
f.
5mm Allan key
g.
4mm Allan key
7.
Suspension measuring gauge (See Fig.5)
8.
A copy of this operator’s manual
Содержание MMLS3
Страница 7: ...MLS Test Systems Pty Ltd Revised April 2013 5...
Страница 12: ...MLS Test Systems Pty Ltd Revised April 2013 10...
Страница 13: ...MLS Test Systems Pty Ltd Revised April 2013 11...
Страница 16: ...MLS Test Systems Pty Ltd Revised April 2013 14...
Страница 19: ...MLS Test Systems Pty Ltd Revised April 2013 17...
Страница 24: ...MLS Test Systems Pty Ltd Revised April 2013 22...
Страница 26: ...MLS Test Systems Pty Ltd Revised April 2013 24...
Страница 42: ...MLS Test Systems Pty Ltd Revised April 2013 40 APPENDIX D Circuit diagrams...
Страница 43: ...MLS Test Systems Pty Ltd Revised April 2013 41...
Страница 44: ...MLS Test Systems Pty Ltd Revised April 2013 42...
Страница 45: ...MLS Test Systems Pty Ltd Revised April 2013 43...
Страница 46: ...MLS Test Systems Pty Ltd Revised April 2013 44...
Страница 48: ...MLS Test Systems Pty Ltd Revised April 2013 46...