MKS Spectra-Physics 100 Скачать руководство пользователя страница 3

 

 

 

  ©Newport Corporation  

MKS Spectra-Physics Confidential  

3

 of 

11

 

 

Introduction 

 

Congratulations on your purchase of a Spectra-Physics system. This guide describes pre- 
installation information for your laser system. 

 

Some preliminary  planning  is  essential  to  avoid  unnecessary  delays  during  installation 
and to ensure easy operation and access to your system. You are requested to carefully 
consider your operating environment prior to installation. Proper water, power and room 
temperature are required for each system. 

 

A checklist of pre-installation considerations is provided in this guide. You are responsible 
for  meeting these  requirements prior  to  installation,  with due  consideration  given to all 
applicable building and safety codes. 

 

We  at Spectra-Physics  intend  to  provide you  with responsive support  so  that  you can 
derive great satisfaction and value in  using our systems  for  your  applications.  We  are 
available to you at 1-800-456-2552. 

 

 

Содержание Spectra-Physics 100

Страница 1: ...Newport Corporation MKS Spectra Physics Confidential 1 of 11 Pre Installation Guide For all Spirit HighQ 2 Laser Models Spectra Physics Inc 3635 Peterson Way Santa Clara CA 95054 April 2020...

Страница 2: ...Instruction Manuals 4 Laser Safety Considerations 4 Diagnostics 4 Pre Installation Considerations 5 Location and Environment 5 Physical Description 6 Utility Requirements 7 Computer Requirements 8 Pr...

Страница 3: ...d to carefully consider your operating environment prior to installation Proper water power and room temperature are required for each system A checklist of pre installation considerations is provided...

Страница 4: ...ction Manuals Please read the manual to get vital information about your system Familiarize yourself with the system You are encouraged to spend as much time as possible reviewing the system component...

Страница 5: ...ons ambient room temperature changes may be an important factor for the laser system s performance Air ducts should not blow directly on laser or optical path E To ensure stable day to day operation t...

Страница 6: ...x 6 4 683 x 310 x 163 88 0 40 0 1040 8 SHG Laser Head 29 9 x 12 2 x 6 4 759 x 310 x 163 99 0 45 0 Power Supply 11 0 x 5 7 x 1 9 280 x 144 x 48 5 8 60 3 9 Chiller 15 7 x 19 0 x 10 5 400 x 483 x 267 68...

Страница 7: ...ments HighQ 2 Controller 100 240 VAC 50 60 Hz Current 2A Spirit One Power Supply 90 305VAC 47 63 Hz Current 10A Chiller HECR008 100 240VAC 50 60 Hz Current 10A Spirit 4 Spirit 8 Spirit 16 non HE Contr...

Страница 8: ...utilize the laser s built in GUI via direct connection to the Spirit head s ethernet port RJ 45 connector HighQ 2 Spirit One Spirit 4 Spirit 8 Spirit 16 Spirit 16HE Spirit 30HE Spirit graphical user i...

Страница 9: ...e the system on your work surface Two or more people may be required to lift some equipment Compare the packing list with your quotation Call your Spectra Physics office about any discrepancies Check...

Страница 10: ...ing The cleaner should be circulated for a minimum of 8 hours the longer the better if time permits in order to assure thorough cleaning Filters ALPS filter All models except HighQ 2 and Spirit One Wh...

Страница 11: ...ntifrogen L coolant solution will ensure a correct coolant level readout of the chiller Fill the chiller reservoir with a mixture of Antifrogen L and distilled water ratio 1 3 Do not use deionized wat...

Отзывы: