22
(K)
When the cut is complete, raise
the Blade completely out of the cut
by turning Depth Control Wheel
counter-clockwise.
MK-20 SERIES
oPERATIoN
(L)
Close Cooling Supply Valve.
Perform the cut using only enough pressure to follow the original marked line. The saw has a
natural tendency to pull towards the side on which the blade is mounted. To assure straight line
cutting, apply pressure to the appropriate handle. If excessive pressure is required reduce the
forward speed of the saw. Driving the saw too fast while cutting may cause the front wheels
to lift causing the blade to cut at uneven depths. Do not attempt to steer the saw. Sudden and
severe corrections can cause the blade to be damaged or broken.
NoTE:
(J)
Slowly lower the Blade until the
desired level is reached and begin
the cut.
(H)
For Wet Cutting, open Cooling
Supply Valve. Verify proper cooling
flow and adjust the water flow on
the Blade to a desired amount.
(G)
Start engine by rotating Ignition
Switch to the right.
(I)
Move the throttle all the way for-
ward to “Fast” position.
(D)
Place Transmission Speed
Lever in Neutral.
(E)
Verify Neutral Engagement Handle
is down, in Neutral. Choke engine
as required for cold starting.
(F)
Push Engine Throttle Handle up
half-way.
Содержание MK-2013HE GX390
Страница 9: ...9 NOTES...
Страница 33: ...33 NOTES...
Страница 36: ...36 MK 20 Series EXPLODED VIEW FIGURE 1 PARTS LIST MK 2020HSP concrete saw P N 156498...
Страница 42: ...42 MK 20 Series Exploded View FIGURE 2 PARTS LIST MK 2024HSP concrete saw P N 158777...
Страница 55: ...55 NOTES...
Страница 58: ...58 notes...
Страница 59: ...59 notes...