OPERATION
48
EN
§4.3 Installation & Operation for TIG Welding
§4.3.1 Set up installation for TIG Welding
(1) Insert the earth cable plug into the positive socket on the front of the machine and tighten it.
(2) Plug the welding torch into the negative socket on the front panel, and tighten it.
(3) Connect the control cable of torch switch to 9 pin socket on the front of the machine .
(4) Connect the gas line of TIG Gun to outlet gas connector on the front of the machine .
Check for
Leaks!
(5) Connect the gas regulator to the Gas Cylinder and connect the gas line to the Gas Regulator.
Check for Leaks!
(6) Connect the gas line to the machine inlet gas connector via the quick push lock connector located
on the rear panel.
Check for Leaks!
(7) Connect the power cable of welding machine with the output switch in electric box on site.
§4.3.2 Operation of the TIG Lift welding method
1. Selection of the welding method:
1) In the main interface, press the MENU key to enter the function selection interface;
Содержание Multi-GMAW 200 LCD PFC
Страница 24: ...23 DE 12 WIG Stecker Belegung EIN AUS 10K Poti zum Reglen des Schwei stromes Stecker Belegung...
Страница 25: ...24 DE 13 Spool GUN Stecker Belegung EIN AUS Taster Strom Regler Stecker Belegung...
Страница 29: ...28 DE 17 Schematischer Schaltplan Multi GMAW 250 LCD PFC 230V...
Страница 103: ...72 EN 6 4 Electrical schematic drawin...