
Operating Instructions MG3 Digital
Integration in Automated Installations
76609409EN-BA-MG3D-V1_6.docx 69/82
2010-08-02
6.3
Flow Chart Channel 1
and
Channel 2 Parallel, but Current 1 and
Current 2 do not Overlap
The pause between the first and second current is too short here to evaluate the first
measurement. The measuring time for the current started first (channel 1) should be set
here so that it overlaps the measuring time of the second current (channel 2). Start of
evaluation of the first current is delayed as a result. A parallel 2-channel measurement of
the second current can be realized here because the Ready signal remains “high”.
Evaluation subsequently follows for both channels within the measuring pause.
Dia3-MG3
high
high
high
high
high
high
high
high
low
low
low
low
low
low
low
low
Current 1 Output
Current 2 Output
Ready Output
Current1 (Head 1)
Current 2 (Head 2)
measuring delay
Ready
for new
measuring
adjusted measuring time channel1
adjusted measuring time channel 2
no new measuring possible
Reject 2 Output
Reject 1 Output
Outputs
accept 1 / 2
limit values
pre-warn
value