'14•SRK-T-164
– 38 –
Installation of remote control switch
Mounting method of battery
Earthing work
+
+
-
-
•
Uncover the remote control switch, and mount the batter-
ies [R03(AAA, Micro)
×
2 pieces] in the body regularly.
(Fit the poles with the indication marks,
,
&
.
without
fail)
•
Earth work shall be carried out without fail in order to prevent electric shock and noise generation.
•
The connection of the earth cable to the following substances causes dangerous failures, therefore it shall never be done.
City water pipe, Town gas pipe, TV antenna, lightning conductor, telephone line, etc.
Trial run and operation
1
Conduct trial run after confi rming that there is no gas leaks.
2
When conducting trial run set the remote control thermostat to continuous operation position. However when the power source is
cut off or when the unit’s operation switch is turned off or was turned to fan operation position, the unit will not go into operation
in order to protect the compressor.
3
Explain to the customer on the correct usage of the air-conditioner in simple layman’s terms.
4
Make sure that drain fl ows properly.
Battery
Cover
Fixing to pillar or wall
•
Conventionally, operate the wireless remote control by
holding in your hand.
•
Avoid installing it on a clay wall etc.
Screws
CAUTION
Do not use new and
old batteries together.
Installations test check points
Check the following points again after completion of the installation, and before turning on the power. Conduct a test run again and
ensure that the unit operates properly.
At the same time, explain to the customer how to use the unit and how to take care of the unit following the instruction manual.
After installation
The power supply voltage is correct as the rating.
No gas leaks from the joints of the operation valve.
Operation valve is fully open.
The pipe joints for indoor and outdoor pipes have been
insulated.
Test run
Air conditioning operation is normal.
No abnormal noise.
Water drains smoothly.
Protective functions are not working.
The remote control is normal.
Operation of the unit has been explained to the customer.
(Three-minute restart preventive timer)
When the air conditioner is restarted or when changing the operation, the unit will not start operating for approximately 3 minutes.
This is to protect the unit and it is not a malfunction.
RMA012A076A_En.indb 38
22-Jan-14 09:00:41
Содержание SRK19CNS-S
Страница 2: ......
Страница 3: ...14 SRK T 164 TECHNICAL MANUAL...
Страница 12: ...10 14 SRK T 164 3 Wireless remote control Unit mm 60 17 3 150 Unit mm 60 17 3 150...
Страница 40: ...38 14 SRK T 164 4 Troubleshooting procedure If the air conditioner runs NO YES 39...
Страница 48: ...46 14 SRK T 164...
Страница 53: ...51 14 SRK T 164 MEMO...
Страница 59: ...57 14 SRK T 164 MEMO...
Страница 62: ...60 14 SRK T 164 CRBE0393 14 2 5 3 6 7 8 9 11 13 4 17 12 15 15 16 15 15 10 1 18 PANEL FAN ASSY...
Страница 66: ...64 14 SRK T 164 CRBE0395 11 7 1 2 8 12 20 4 20 13 10 6 5 3 13 9 13 15 14 16 17 21 18 19 20 PANEL FAN ASSY...