10-27
Chapter 10 COOLING SYSTEM
2.7 Heat Exchanger - Disassemble and Inspect
Heat Exchanger - Disassemble and Inspect
2.7.1 Heat Exchanger Element - Clean
(1)
Clean the pipe outside pouring water with wire brush or
the like. Inspect the element for corrosion and cracks.
(2)
Remove deposits from inside of pipes inserting a bar.
Heat Exchanger Element - Clean
1
2
2
3
4
Replace: every 500 hours
or within 12 months
Cleaning: every 2000 hours
or within 24 months
Replace
Replace
Replace
MTK spec
Disassembling Sequence
1
U-bolt
2
Cover
3
Zinc
4
Heat exchanger
Содержание S12A2
Страница 1: ...SERVICE MANUAL September 2010 Pub No 99269 20170 199269 20170 ...
Страница 2: ......
Страница 16: ......
Страница 20: ......
Страница 42: ......
Страница 44: ......
Страница 68: ......
Страница 69: ...3 1 Chapter 3 SERVICE TOOLS 1 Special Tools 3 3 ...
Страница 70: ......
Страница 77: ...4 1 Chapter 4 OVERHAUL INSTRUCTIONS 1 Determining Overhaul Timing 4 3 2 Compression Pressure Measure 4 4 ...
Страница 78: ......
Страница 82: ......
Страница 136: ......
Страница 174: ......
Страница 218: ......
Страница 220: ......
Страница 242: ......
Страница 244: ......
Страница 294: ......
Страница 310: ......
Страница 320: ......
Страница 322: ......
Страница 334: ......
Страница 354: ......