7
COMMUNICATION WITH INTELLIGENT FUNCTION
MODULE
7.2 Communication with CC-Link IE Controller Network Module or MELSECNET/H Module
7
- 2
1
O
verv
iew
2
Per
fo
rma
nce
S
p
ecifica
tio
n
3
S
equ
en
ce P
ro
g
ra
m
Co
nfig
ura
tio
n a
nd
E
xecut
io
n Co
nd
iti
o
ns
4
I/O N
unb
er
Assig
n
m
e
nt
5
Me
mor
ie
s a
nd
File
s
Ha
nd
led
by CP
U Mo
du
le
6
Func
tions
7
Co
mmu
nica
tion
with
Inte
llig
en
t Fu
n
ct
ion
Mo
du
le
8
P
a
ram
et
e
rs
7.2 Communication with CC-Link IE Controller Network Module or
MELSECNET/H Module
Communication between the CPU module and the CC-Link IE controller network module
or MELSECNET/H module is performed by link refresh.
To execute link refresh, the refresh parameters need to be set on the *** of Network
parameter in GX Developer.
For details on the network parameter setting items, refer to Section 8.2.
POINT
When a CC-Link IE controller network module or MELSECNET/H module is used
with a safety CPU module, the functions that can be used are restricted.
For details on restrictions, refer to Appendix 4 and 5.
Remark
For details on the *** of Network parameter, refer to the following manuals.
CC-Link IE Controller Network Reference Manual
Q Corresponding MELSECNET/H Network System Reference Manual (PLC
to PLC Networks)
7.3 Communication with Ethernet Module
Communication between the CPU module and the Ethernet module is performed by
dedicated instructions. For details on the dedicated instructions, refer to Appendix 7.
POINT
When an Ethernet module is used with a safety CPU module, the functions that
can be used are restricted.
For details on the restrictions, refer to Appendix 6.
Содержание MELSEC QS Series
Страница 1: ......
Страница 2: ......
Страница 24: ...A 22 Memo ...
Страница 258: ...Index 3 Memo ...
Страница 263: ......
Страница 264: ......