5. Refrigerant piping work

5.2.5. Check (Fig. 5-7)

•  Compare the flared work with a figure in right side hand.
•  If flare is noted to be defective, cut off the flared section and do flaring work again.

/

 Smooth all around

4

 Scratch on flared plane

0

 Inside is shining without any scratches

5

 Cracked

1

 Even length all around

6

 Uneven

2

 Too much

7

 Bad examples

3

 Tilted

•  Apply a thin coat of refrigeration oil on the seat surface of pipe. (Fig. 5-8)
•  For connection first align the center, then tighten the first 3 to 4 turns of flare nut.
•  Use tightening torque table below as a guideline for indoor unit side union joint 

section, and tighten using two wrenches. Excessive tightening damages the flare 
section.

Copper pipe O.D.

(mm)

Flare nut O.D.

(mm)

Tightening torque

(N·m)

ø6.35

17

14 - 18

ø9.52

22

34 - 42

ø12.7

26

49 - 61

ø15.88

29

68 - 82

 Warning:

When installing the unit, securely connect the refrigerant pipes before start-
ing the compressor.

 Warning:

Be careful of flying flare nut! (Internally pressurized)
Remove the flare nut as follows:
1. Loosen the nut until you hear a hissing noise.
2. Do not remove the nut until the gas has been completely released (i.e., 

hissing noise stops).

3. Check that the gas has been completely released, and then remove the nut.

Fig. 5-7

Fig. 5-8

1

0

/

2

3

4

5

6

7

B

5.5. Purging procedures leak test

*Close

*Open

Hexagonal wrench

Stop valve

*4 to 5 turns

Stop valve

(or the vacuum
pump with the
function to
prevent the back
flow)

Gauge manifold
valve (for R410A)

Pressure gauge

  (for R410A)

Compound pressure
gauge (for R410A)

-0.101 MPa
(-760 mmHg)

Handle
Low

Handle High

Window

Charge hose
(for R410A)

Vacuum
pump

Adapter for
preventing
the back flow

Charge hose
(for R410A)

Service port

Stop
valve

PURGING PROCEDURES

Connect the refrigerant pipes (both the liquid and gas pipes) between the indoor
and the outdoor units.

Remove the service port cap of the stop valve on the side of the outdoor unit gas pipe.
(The stop valve will not work in its initial state fresh out of the factory (totally closed
with cap on).)

Connect the gage manifold valve and the vacuum pump to the service port of the
stop valve on the gas pipe side of the outdoor unit.

Run the vacuum pump. (Vacuumize for more than 15 minutes.)

Check the vacuum with the gage manifold valve, then close the gage manifold valve,
and stop the vacuum pump.

Leave it as is for one or two minutes. Make sure the pointer of the gage manifold
valve remains in the same position. Confirm that the pressure gage show -0.101
MPa (-760 mmHg)

Pipe length :

7 m maximum

No gas charge is needed.

Pipe length exceeding 7 m

Charge the prescribed

amount of gas.

Remove the gage manifold valve quickly from the service port of the stop valve.

After refrigerant pipes are connected and evacuated, fully open all stop valves on
gas and liquid pipe sides.
Operating without fully opening lowers the performance and causes trouble.

Tighten the cap to the service port to obtain the initial status.

Retighten the cap.

Leak test

Содержание SUZ-KA60VA3

Страница 1: ...lleren van de airconditioner begint MANUAL DE INSTALACIÓN Para un uso correcto y seguro lea detalladamente este manual y el manual de instalación de la unidad interior antes de instalar la unidad de aire acondicionado MANUALE DI INSTALLAZIONE Per un uso sicuro e corretto leggere attentamente il presente manuale ed il manuale d installazione dell unità interna prima di installare il condizionatore ...

Страница 2: ...relocating or servicing the air conditioner use only the specified refrigerant R410A to charge the refrigerant lines Do not mix it with any other refrigerant and do not allow air to remain in the lines If air is mixed with the refrigerant then it can be the cause of abnormal high pressure in the refrigerant line and may result in an explosion and other hazards The use of any refrigerant other than...

Страница 3: ...wind it is recommended to install a baffle board on the air outlet side of the outdoor unit Units should be installed by licensed contractor accordingly to local code re quirement Air outlet 2 10 mm 21 mm slot Air inlet 285 40 344 5 304 325 800 500 150 400 44 Drainage hole W42 In case of Heater models W33 69 Drain hose Drain socket 2 1 Fig 4 1 4 Drain piping for outdoor unit Fig 4 1 4 1 Accessorie...

Страница 4: ... 35 1 4 0 8 mm 8 mm For gas 12 7 1 2 0 8 mm 8 mm SUZ KA60 For liquid 6 35 1 4 0 8 mm 8 mm For gas 15 88 5 8 0 8 mm 8 mm SUZ KA71 For liquid 9 52 3 8 0 8 mm 8 mm For gas 15 88 5 8 1 0 mm 8 mm 2 Ensure that the 2 refrigerant pipes are well insulated to prevent condensation 3 Refrigerant pipe bending radius must be 100 mm or more Caution Using careful insulation of specified thickness Excessive thick...

Страница 5: ... the vacuum pump with the function to prevent the back flow Gauge manifold valve for R410A Pressure gauge for R410A Compound pressure gauge for R410A 0 101 MPa 760 mmHg Handle Low Handle High Window Charge hose for R410A Vacuum pump Adapter for preventing the back flow Charge hose for R410A Service port Stop valve PURGING PROCEDURES Connect the refrigerant pipes both the liquid and gas pipes betwe...

Страница 6: ...r cables Power supply cord Caution Use care not to make miswiring Firmly tighten the terminal screws to prevent then from loosening After tightening pull the wires lightly to confirm that they do not move Connect cable from the indoor unit correctly on the terminal block Use the same terminal block and polarity as is used with the indoor unit For aftercare maintenance give extra length to connecti...

Страница 7: ... 3 1 5 Polar 3 1 5 Polar 3 1 5 Polar Indoor unit Outdoor unit earth 1 Min 1 5 1 Min 1 5 1 Min 1 5 Circuit rating Outdoor unit L N 2 AC 230 V AC 230 V AC 230 V Indoor unit Outdoor unit S1 S2 2 AC 230 V AC 230 V AC 230 V Indoor unit Outdoor unit S2 S3 2 DC 12 V DC 24 V DC 12 V DC 24 V DC 12 V DC 24 V 1 A breaker with at least 3 mm contact separation in each poles shall be provided Use earth leakage ...

Страница 8: ...e be sure to put the contact address telephone number on this manual before handing it to the customer This product is designed and intended for use in the residential commercial and light industrial environment The product at hand is based on the following EU regulations Low Voltage Directive 2006 95 EC Electromagnetic Compatibility Directive 2004 108 EC Machinery Directive 2006 42 EC Energy rela...

Отзывы: