3 - 28 3 - 28
3 SPECIFICATIONS
MELSEC-Q
3.4.6 Conversion completion flag (Un\G10)
(1) You can check whether the channels specified for conversion enable succeeded
in normal temperature conversion.
(2) You can make check on each channel using the conversion completion flag.
(3) The conversion completion flag is cleared when the Operating Condition Setting
Request (Y9) is turned from ON to OFF.
(4) The Conversion Completion Flag (XE) turns on when conversions of all channels
set for conversion enable are completed.
• When Conversion enable/disable setting is turned from 1 (disable) to 0 (enable)
After the measured temperature value is stored into buffer memory, the conversion
completion flag of the corresponding channel is turned to 1.
• When Conversion enable/disable setting is turned from 0 (enable) to 1 (disable)
The conversion completion flag of the corresponding channel is turned to 0.
(5) Read measured temperature value using this area or the Conversion completion
flag (XE) as an interlock.
REMARK
Between the Q64RD/Q64RD-G whose first 5 digits of product information are 07071
or earlier and those of 07072 or later, the Conversion Completion Flag (Un\G10)
operation is different.
For details, refer to Appendix 1.2 and 1.3.
b15 b14 b13 b12 b11 b10
b9
b8
b7
b6
b5
b4
b3
b2
b1
b0
0
0
0
0
CH.4 CH.3 CH.2 CH.1
1: Conversion completed
0: Under conversion or unused
0
0
0
0
0
0
0
0
Содержание Q64RD
Страница 2: ......
Страница 99: ...5 17 5 17 5 UTILITY PACKAGE GX Configurator TI MELSEC Q X Y Monitor Test 1 OMC refresh ...
Страница 108: ...6 3 6 3 6 PROGRAMMING MELSEC Q 2 Program example 6 1 2 Program example used when utility package is not used ...
Страница 113: ...6 8 6 8 6 PROGRAMMING MELSEC Q 2 Program example ...
Страница 114: ...6 9 6 9 6 PROGRAMMING MELSEC Q ...
Страница 178: ...App 19 App 19 APPENDICES MELSEC Q Appendix 3 External Dimension Diagram 1 Q64RD Q64RD G Unit mm ...
Страница 181: ...WARRANTY ...
Страница 183: ......