111
Photo 19
12. Removing the reactor (DCL) (V model only)
(1) Remove the electrical parts box. (See photo 4)
(2) Remove the cont. box base fixing screws (3 for front/ 4 x
10) to remove the cont. box base.
(3) Disconnect the connector, DCL1 (WH) and DCL2 (WH) on
the power circuit board.
(4) Release the lead wire from the hole on cont. box base.
(5) Loosen the cable strap for the lead wire.
(6) Remove the screws for reactor (4 for below/ 4 x 10) to
remove the reactor.
Reactor
Screws
Screws
Electrical parts box
Photo 20
Reactor box
fixing screws
Reactor fixing
screws
Reactor
4-way valve
OPERATING PROCEDURE
PHOTOS
13. Removing the reactor (ACL) (Y model only)
(1) Remove the service panel. (See Photo 1)
(2) Loosen the clamp for the lead wire on separator.
(3) Disconnect the lead wires from the reactor (ACL).
(4) Remove the reactor box fixing screws (4 for right side/
4x10) to remove the reactor box.
(5) Remove 4 screws for reactor in the reactor box to remove
the reactor.
Note 1: Pay extra attention when handling the reactor
since it is very heavy (4.1 kg).
Note 2: The reactor can be easily removed by removing
the electrical parts box.
OCH654