34
Screws
OPERATING
PROCEDURE
PHOTOS
8. Removing the booster heater
(1) Remove the intake grille.
(2) Remove the front panel.
(3) Remove the insulation panel.
(4) Remove the green connector of the heater.
9. Removing the indoor heat exchanger
(1) Remove the intake grille.
(2) Remove the front panel.
(3) Remove the insulation panel.
(4) Remove the 6 screws of the top panel and
remove the top panel.
(5) Remove the swing louver.
(6) Remove the electrical parts box.
(7) Remove the 3 screws of the drain pan support
and remove the drain pan support.
(8) Remove the 4 screws of the indoor heat
exchanger to remove it.
10. Removing the drain pan
(1) Remove the intake grille.
(2) Remove the front panel.
(3) Remove the insulation panel.
(4) Remove the top panel.
(5) Remove the swing louver.
(6) Remove the electrical parts box and the drain
pan
support.
(7) Remove the pipe support.
(8) Remove the drain pan.
Photo 10
Photo 11
Photo 12
Swing louver
Booster heater
Screws
Drain pan
support
Electrical
parts box
Drain pan
Drain pan support
Indoor heat exchanger
Indoor heat
exchanger
Screws
Pipe support
Screws
Содержание PSA-RP100GA
Страница 43: ...43 ...