EN-27
9. Visual PA2 (Visual PA2 enabled projectors only)
9.5. Configuring the Schedule function of Visual PA2
By using the Visual PA2’s Schedule function, your intended messages can be displayed on the screen at a set
time.
(1) Click [Edit] in the Schedule area.
• "Visual PA2 Schedule" window is displayed. (The window below shows the example when the schedules
have been entered in three rows.)
Item
Description
Enable
Enables the Schedule function for a particular day or period in each row.
Day
From the pull-down menu, selects the day or period during which the Schedule
function is enabled. (You can select your choice from Sun, Mon, Tue, Wed, Thu,
Fri, Sat, Mon-Fri, Mon-Sat, Sat-Sun, and Everyday.)
Turn-on Time
From the pull-down menu, sets the start time in the Schedule function.
Period
From the pull-down menu, sets time period during which a message is displayed.
Data Name
From the pull-down menu, selects the message to be displayed on the screen
when the Schedule function is enabled.
(More than one message should be saved in advance. See “9.2. Saving
messages entered and settings specified in Visual PA2” on page 26.)
Clear
Clears all entries from the selected row.
Exit
Saves changes and closes the window.
(2) Configure settings (
through
) and check/uncheck the checkboxes for
.
• Up to ten schedules can be configured, using the four rows in the table. (You can configure a schedule for
each row.)
• By default, when no schedule is entered, the table has only one row. A new row is automatically
added when you enter the items for
,
,
, and
in the first row. In this manner, up to ten rows are
automatically added to the table.
(3) Click [Exit] to close the window.
<Note>
• Once a schedule has been configured, it is executed automatically even if the Visual PA2 window is not
displayed.
• If you send messages manually from Visual PA2 when a schedule is being executed, these messages have
higher priority over that schedule. In addition, when the settings of a schedule currently being executed are
reconfigered, the Visual PA2 window will close automatically.
• More than one schedule cannot be configured at the same time on the same day.
• The Schedule Setting will be executed while “ProjectorView ” is in operation.
• Depending on usage conditions, such as when there are so many projectors to control, time lapses may occur
between the start time of Visual PA2 and the start time of a schedule.
• When Network Time Protocol (NTP) is used to automatically synchronize with an Internet time server, the start
time of a pre-configured schedule may not match the clock of the projector, and the schedule may not be
executed.
• When the automatic time adjustment by summer time is valid, the schedule operation may not be executed
because the time is automatically adjusted before and after switching over.