OPERATING PROCEDURE
PHOTOS & ILLUSTRATIONS
13. Removing the heat exchanger
(1) Remove the air intake grille. (See Figure 1, 2)
(2) Remove the beam. (See Photo 1)
(3) Remove the electrical cover. (See Photo 1)
(4) Pull the electrical box downward. (See Photo 2)
(5) Remove the left and right side panels. (See Figure 3)
(6) Remove the under panel. (See Photo 14)
(7) Remove the drain pan. (See Photo 15,16,17)
(8) Remove the pipe cover. (See Photo 18)
(9) Remove the pipe thermistors (TH2 and TH5) from each
holder. (See Photo 19)
(10) Remove the pipe band fixing screw and remove the
pipe band. (See Photo 22)
(11) Remove 2 screws from the heat exchanger and
remove the heat exchanger.
Photo 22
Pipe band fixing
screw
Pipe band
Heat exchanger
fixing screws
Heat exchanger
Vane
Photo 23
Heat exchanger
C
Copyright 2010 MITSUBISHI ELECTRIC CORPORATION
Distributed in Oct. 2012 No.OCH491 REVISED EDITION-B
Distributed in Feb. 2012 No.OCH491 REVISED EDITION-A
Distributed in Dec. 2010 No.OCH491
Made in Japan
HEAD OFFICE : TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN
New publication, effective Oct. 2012
Specifications are subject to change without notice.