background image

VH79B003H01

HEAD OFFICE: TOKYO BUILDING, 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN

Содержание MXZ-6E120VAD2

Страница 1: ... Air Conditioner MXZ 6E120VAD2 English Installation Manual For INSTALLER This manual only describes the installation of outdoor unit When installing the indoor unit refer to the installation manual of indoor unit ...

Страница 2: ...e intermediate connection Incomplete connecting and securing could cause fire n Do not install the unit in a place where inflammable gas may leak If gas leaks and accumulates in the area around the unit it could cause an explosion n Do not use intermediate connection of the power cord or the extension cord and do not connect many devices to one AC outlet It could cause a fire or an electric shock ...

Страница 3: ...ecommended to install a baffle board on the air outlet side of the outdoor unit Avoid the following places for installation where air conditioner trouble is liable to occur Where flammable gas could leak Where there is much machine oil Salty places such as the seaside Where sulfide gas is generated such as hot spring sewage waste water Where there is high frequency or wireless equipment Where ther...

Страница 4: ...lt M10 370 mm 417 mm When the piping is to be attached to a wall containing metals tin plated or metal netting use a chemically treated wooden piece 20 mm or thicker between the wall and the piping or wrap 7 to 8 turns of insula tion vinyl tape around the piping To use existing piping perform COOL operation for 30 minutes and pump down before removing the old air conditioner Remake flare according...

Страница 5: ...e sure to fix both cable and wire with cable clamps Connecting order Connect the terminal block in following order A B C D E F P DR Terminal block for indoor outdoor unit Cable clamps 600 370 Service panel Screws Note Removing the handle increases the effectiveness of the wiring operation Be sure to reinstall the handle 2 OUTDOOR UNIT INSTALLATION Terminal block for DRED Interface DRED Interface P...

Страница 6: ...ith Fig 6 If flare is noted to be defective cut off the flared section and do flaring work again WARNING When installing the unit securely connect the refrigerant pipes before starting the compressor CAUTION When there are the ports which are not used make sure their nuts are tightened securely 4 1 PURGING PROCEDURES AND LEAK TEST 1 Remove service port cap of stop valve on the side of the outdoor ...

Страница 7: ...eration mode 1 Be sure to turn off the main power for the air conditioner before making the setting 2 Set the 3 of SW1 on the outdoor controller board to ON to enable this function 3 To lock the operation mode in COOL DRY mode set the 4 of SW1 on the outdoor controller board to OFF To lock the operation in HEAT mode set the same switch to ON 4 Turn on the main power for the air conditioner Descrip...

Страница 8: ...event electronic control P C board damage make sure to perform static elimination before operating this function This function does not operate when the outside temperature is 0 C or below LED indication during detection LED1 Red LED2 Yellow LED3 Green Lit Lit Once Result of piping wiring correction function LED1 Red LED2 Yellow LED3 Green Result Lit Not lit Lit Completed Problem corrected or norm...

Страница 9: ...blank indd 15 2017 10 31 10 24 48 ...

Страница 10: ...blank indd 16 2017 10 31 10 24 48 ...

Страница 11: ...blank indd 17 2017 10 31 10 24 48 ...

Страница 12: ...VH79B003H01 HEAD OFFICE TOKYO BUILDING 2 7 3 MARUNOUCHI CHIYODA KU TOKYO 100 8310 JAPAN ...

Отзывы: