88
OPERATING PROCEDURE
PHOTOS
4. Removing the expansion valve
(1) Remove the top panel (Photo 1).
(2) Remove the service panel (Photo 1).
(Gas recovery is not required if the unit is pumped down.)
(3) Remove the front panel for removing LEV G (Photo 1).
(4) Remove the electrical parts for removing LEV G (Photo 3, 4).
(5) Remove the LEV coils.
(6) Detach the brazed parts of expansion valves and pipes.
Photo 8
LEV coils G
Photo 7
Suction pipe
brazed part
Discharge pipe
brazed part
Compressor nuts
LEV coils
HPS
Expansion
valves
Expansion
valves
2 way valve solenoid coil
Содержание MXZ-3C54VA
Страница 16: ...16 WIRING DIAGRAM 6 MXZ 3C54VA ...
Страница 17: ...17 MXZ 3C68VA ...
Страница 18: ...18 MXZ 4C71VA ...
Страница 19: ...19 MXZ 4C80VA ...
Страница 20: ...20 MXZ 5C100VA ...
Страница 21: ...21 MXZ 6C120VA ...