82
OPERATING PROCEDURE
PHOTOS
6. Removing the reactor
(1) Remove the top panel (Photo 1).
(2) Remove the service panel, cabinet, back panel, and the
electrical parts (Photo 1, 2, 3, 4).
(3) Disconnect the reactor lead wire from the terminal of the
reactor.
(4) Remove the screws of the reactor, and remove the reactor
(Photo 9).
Photo 9
4. Removing the 4-way valve
(1) Remove the top panel (Photo 1).
(2) Remove the service panel, the cabinet, and the back panel
(Photo 1, 2, 3).
(3) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure gauge
shows 0 kg/cm
2
(0 MPa).
(4) Remove the electrical parts (Photo 4).
(5) Detach the brazed parts of 4-way valve and pipe (Photo 7).
5. Removing the expansion valve
(1) Remove the top panel (Photo 1).
(2) Remove the service panel, the cabinet, and the back panel
(Photo 1, 2, 3).
(Gas recovery is not required if the unit is pumped down.)
(3) Remove the electrical parts for removing LEV E (Photo 4, 5).
(4) Remove the LEV coils.
(5) Detach the brazed parts of expansion valves and pipes.
4 way valve
R.V. coil
Expansion
valves
Photo 7
Photo 8
LEV coils
Brazed parts
Screws of the reactor
Содержание MXZ-3C54VA
Страница 16: ...16 WIRING DIAGRAM 6 MXZ 3C54VA ...
Страница 17: ...17 MXZ 3C68VA ...
Страница 18: ...18 MXZ 4C71VA ...
Страница 19: ...19 MXZ 4C80VA ...
Страница 20: ...20 MXZ 5C100VA ...
Страница 21: ...21 MXZ 6C120VA ...