44
12
DISASSEMBLY INSTRUCTIONS
(1) Slide the sleeve and check if there is a locking lever or not.
(2) The terminal with this connector has the
locking mechanism.
Slide the sleeve.
Pull the terminal while
pushing the locking
lever.
Hold the sleeve, and
pull out the terminal
slowly.
Connector
Sleeve
Locking lever
MUZ-GB50VA
NOTE
: Turn OFF power supply before disassembly.
OPERATING PROCEDURE
PHOTOS
1. Removing the cabinet
(1) Remove the screws of the service panel.
(2) Remove the screws of the top panel.
(3) Remove the screw of the valve cover.
(4) Remove the service panel.
(5) Remove the top panel.
(6) Remove the valve cover.
(7) Disconnect the power supply and indoor/outdoor connecting
wire.
(8) Remove the screws of the cabinet.
(9) Remove the cabinet.
(10) Remove the screws of the back panel.
(11) Remove the back panel.
Photo 3
Photo 1
Photo 2
Screw of the top panel
Screws of the cabinet
Screws
of the
cabinet
Screw of the motor support
Set screws of the back panel
Screws
of the
back
panel
Screws
of the top
panel
Screws of
the cabinet
Screw of the service panel
Screw of
the valve
cover
Set screws
of the back
panel
<"Terminal with locking mechanism" Detaching points>
The terminal which has the locking mechanism can be detached as shown below.
There are two types (refer to (1) and (2)) of the terminal with locking mechanism.
The terminal without locking mechanism can be detached by pulling it out.
Check the shape of the terminal before detaching.
Содержание MUZ-GB50VA
Страница 8: ...8 MUZ GB50VA E3 ...