OPERATING PROCEDURE
PHOTOS/FIGURES
6. Removing the horizontal vanes (R)(L) and the
horizontal vane motors (R)(L)
(Photos 8, 12, 13, 14)
(1) Remove the front panel, horizontal vanes (upper R/L),
(lower R/L), the corner boxes (R) (L), the panels (U)
(R) (L), V.A. clamp, the electrical cover, Wi-Fi assem-
bly, the panel (F), and DISPLAY and i-see SENSOR
ASSEMBLY.
(2) Remove the following connector (Photo 8):
<Indoor electronic control P.C. board>
CN151 (Vane motors)
(3) Pull out the drain hose from the nozzle assembly.
(4) Pull and remove the nozzle assembly (4 catches)
(Photo 12).
(5) Cut off the cable tie to secure the lead wires on the
right side of the nozzle assembly (Photo 13).
Removing horizontal vane motors (R) (Photo 13)
(6) Loosen the lead wires, and disconnect the connector
of the horizontal vane motors (R).
(7) Remove the 2 screws of the horizontal vane motors (R).
(8) Remove the horizontal vane motors (R).
Removing horizontal vane motors (L) (Photo 14)
(9) Loosen the lead wires, and disconnect the connector
of the horizontal vane motors (L).
(10) Remove the 2 screws of the horizontal vane motors
(L).
(11) Remove the horizontal vane motors (L).
52
Photo 13
Cable tie
Screws of the horizontal vane motor (R)
Horizontal vane motor (R)
Photo 14
Screws of the horizontal vane motor (L)
Horizontal vane motor (L)
Photo 12
Catches of nozzle assembly (4 places)
Photo 14
Photo 13
Screws of the horizontal vane motor (R)
Screws of the horizontal vane motor (L)
OBH902A