OPERATING PROCEDURE
PHOTOS/FIGURES
Removing the panel (R) (Photos 1, 2, Figure 1)
(1) Remove the front panel and the horizontal vanes (U)
(L).
(2) Remove the screw cap on the panel (R), and the
screw.
(3) Remove the 2 screws of the panel (R), and pull the top
of the panel (R) toward you to remove.
Removing the panel (L) (Photos 1, 2, Figure 1)
(1) Remove the front panel and the horizontal vanes (U)
(L).
(2) Remove the screw cap on the panel (L), and the
screw.
(3) Remove the screw of the panel (L), and pull the top of
the panel (L) toward you to remove.
Removing the panel (F) (Photos 1, 2, 3 Figure 1)
(1) Remove the front panel and the horizontal vanes (U)
(L).
(2) Remove the panels (R) (L).
(3) Remove the Wi-Fi interface on the right side of the
panel (F). Pull out its cable, and remove the cable tie
(Refer to section 2).
(4) Remove the panel (F) from the bottom to the top.
Removing the panel (U) (Photo 2, Figure 1)
(1) Remove the front panel and the horizontal vanes (U)
(L).
(2) Remove the panels (R) (L).
(3) Remove the center hook of the panel (U), and pull it
toward you to remove.
Pho
to 2
46
Screws of the
panel (R)
Panel (R)
Panel (L)
Panel (F)
Screw cap
on the panel (L)
Screw cap
on the panel (R)
Panel (U)
Hook of the panel (U)
Screw of the
panel (L)
OBH932
Содержание MSZ-AY25VG-ET1
Страница 8: ...8 WIRING DIAGRAM 6 MSZ AY50VG ET1 MSZ AY25VG ET1 MSZ AY35VG ET1 MSZ AY42VG ET1 OBH932 ...
Страница 9: ...9 MSZ AY50VGK E1 SC1 ER1 MSZ AY25VGK E1 SC1 ER1 MSZ AY35VGK E1 SC1 ER1 MSZ AY42VGK E1 SC1 ER1 OBH932 ...
Страница 10: ...10 MSZ AY50VGK ET1 MSZ AY25VGK ET1 MSZ AY35VGK ET1 MSZ AY42VGK ET1 OBH932 ...
Страница 11: ...11 MSZ AY50VGKP E1 SC1 ER1 MSZ AY25VGKP E1 SC1 ER1 MSZ AY35VGKP E1 SC1 ER1 MSZ AY42VGKP E1 SC1 ER1 OBH932 ...
Страница 12: ...12 MSZ AY50VGKP ET1 MSZ AY25VGKP ET1 MSZ AY35VGKP ET1 MSZ AY42VGKP ET1 OBH932 ...