background image

4-1. PURGING PROCEDURES AND LEAK TEST

1)  Remove service port cap of stop valve on the side of the outdoor unit gas pipe. (The stop 

valves are fully closed and covered in caps in initial state.)

2) Connect gauge manifold valve and vacuum pump to service port of stop valve on the 

gas pipe side of the outdoor unit.

4-2. TEST RUN

1) Insert power supply plug into the power outlet and/or turn 

RQWKHEUHDNHU

2) Press the E.O. SW once for COOL, and twice for HEAT 

operation. Test run will be performed for 30 minutes. If the 

OHIWVLGH ODPS RI WKH RSHUDWLRQ LQGLFDWRU EOLQNV HYHU\ 

seconds, inspect the indoor/outdoor unit connecting wire 
(A) for mis-wiring.  After the test run, emergency mode (set 
temperature 24ºC) will start.

3) To stop operation, press the E.O. SW several times until 

all LED lamps turn off. Refer to operating instructions for 
details. 

Checking the remote (infrared) signal reception

3UHVVWKH2))21EXWWRQRQWKHUHPRWHFRQWUROOHUDQGFKHFNWKDWDQHOHFWURQLFVRXQG

is heard from the indoor unit. Press the OFF/ON button again to turn the air conditioner off.
•  Once the compressor stops, the restart preventive device operates so the compressor 

will not operate for 3 minutes to protect the air conditioner.

4-3. AUTO RESTART FUNCTION

7KLVSURGXFWLVHTXLSSHGZLWKDQDXWRUHVWDUWIXQFWLRQ:KHQWKHSRZHUVXSSO\LVVWRSSHG
GXULQJRSHUDWLRQVXFKDVGXULQJEODFNRXWVWKHIXQFWLRQDXWRPDWLFDOO\VWDUWVRSHUDWLRQLQ

the previous setting once the power supply is resumed. (Refer to the operating instruc-
tions for details.) 

4-4. EXPLANATION TO THE USER

•  Using the OPERATING INSTRUCTIONS, explain to the user how to use the air condi-

WLRQHUKRZWRXVHWKHUHPRWHFRQWUROOHUKRZWRUHPRYHWKHDLU¿OWHUVKRZWRUHPRYHRU

put the remote controller in the remote controller holder, how to clean, precautions for 
operation, etc.).

•  Recommend the user to read the OPERATING INSTRUCTIONS carefully.

Stop valve for 
GAS

Stop valve cap

7RUTXHWR

29.4 N•m, 200 

WRNJI‡FP

Vacuum pump (or the vacuum 
pump with the function to 

SUHYHQWWKHEDFNÀRZ

Gauge manifold valve 
(for R32, R410A)

Compound pressure gauge 
(for R32, R410A)

0.101 MPa 

(

760 mmHg)

Handle 
Low

Handle High

Adapter for 
preventing the 

EDFNÀRZ

Charge hose 
(for R32, R410A)

*Close

*Open

Hexagonal wrench

Precautions when using the control valve

When attaching the control valve 
to the service port, valve core may 
deform or loosen if excess pressure 

LVDSSOLHG7KLVPD\FDXVHJDVOHDN

Service port

Body

Close

<R32>

Open

Control 
valve

A

When attaching the control valve to 

WKHVHUYLFHSRUWPDNHVXUHWKDWWKH

valve core is in closed position, and 
then tighten part A. Do not tighten 
part A or turn the body when valve 
core is in open position.

Service port cap

7RUTXHWR

17.7 N•m, 140 to 

NJI

•cm)

*4 to 5 turns

3) Run the vacuum pump. (Vacuumize until 500 microns is achieved.)

&KHFNWKHYDFXXPZLWKJDXJHPDQLIROGYDOYHWKHQFORVHJDXJHPDQLIROGYDOYHDQGVWRS

the vacuum pump.

/HDYHDVLWLVIRURQHRUWZRPLQXWHV0DNHVXUHSRLQWHUJDXJHPDQLIROGYDOYHUHPDLQV

LQWKHVDPHSRVLWLRQ&RQ¿UPWKDWSUHVVXUHJDXJHVKRZV±03D>*DXJH@±

mmHg).

5HPRYHJDXJHPDQLIROGYDOYHTXLFNO\IURPVHUYLFHSRUWRIVWRSYDOYH

7) After refrigerant pipes are connected and evacuated, fully open all stop valves on both 

VLGHVRIJDVSLSHDQGOLTXLGSLSH2SHUDWLQJZLWKRXWIXOO\RSHQLQJORZHUVWKHSHUIRUPDQFH

and this causes trouble.

8)  Refer to 1-3., and charge the prescribed amount of refrigerant if needed. Be sure to charge 

VORZO\ZLWKOLTXLGUHIULJHUDQW2WKHUZLVHFRPSRVLWLRQRIWKHUHIULJHUDQWLQWKHV\VWHPPD\

be changed and affect performance of the air conditioner.

9) Tighten cap of service port to obtain the initial status.

/HDNWHVW

Stop valve 
for LIQUID

Caution:

‡ $IWHUWHVWUXQRUUHPRWHVLJQDOUHFHSWLRQFKHFNWXUQRIIWKHXQLWZLWKWKH(26:RU

the remote controller before turning off the power supply. Not doing so will cause the 
unit to start operation automatically when power supply is resumed.

To the user

‡ $IWHULQVWDOOLQJWKHXQLWPDNHVXUHWRH[SODLQWKHXVHUDERXWDXWRUHVWDUWIXQFWLRQ

•  If auto restart function is unnecessary, it can be deactivated. Consult the service 

representative to deactivate the function. Refer to the service manual for details.

4.  PURGING PROCEDURES, LEAK TEST, AND TEST RUN

Pressure gauge
(for R32, R410A)

Charge 
hose

0DNHVXUHWR

replace the cap after 
the operation.

 

 

WARNING

7RDYRLGULVNRI¿UHPDNHVXUHWKDWWKHUHDUHQRÀDPPDEOHKD]DUGVRULJQLWLRQULVNV

before opening the stop valves.

Emergency operation switch
(E.O. SW)

Содержание MSZ-AS90VGD

Страница 1: ...XH WR GHIHFWLYH contact defective insulation exceeding the permissible current etc H VXUH WR XVH WKH SDUWV SURYLGHG RU VSHFL HG SDUWV for the installation work 7KH XVH RI GHIHFWLYH SDUWV FRXOG FDXVH DQ LQMXU RU OHDNDJH RI ZDWHU GXH WR D UH DQ HOHFWULF VKRFN WKH XQLW IDOOLQJ etc When plugging the power supply plug into the outlet make sure that there is no dust clogging or loose parts in both the o...

Страница 2: ...RQDO UHIULJHUDQW 5 FKDUJH LV UHTXLUHG 1R DGGLWLRQDO FKDUJH LV UHTXLUHG IRU SLSH OHQJWK OHVV WKDQ P Additional refrigerant A pipe length m 15 QVXODWLRQ PDWHULDO HDW UHVLVWLQJ IRDP SODVWLF VSHFL F JUDYLW H VXUH WR XVH WKH LQVXODWLRQ RI VSHFL HG WKLFNQHVV FHVVLYH WKLFNQHVV PD FDXVH LQFRUUHFW LQVWDOODWLRQ RI WKH LQGRRU XQLW DQG LQVXI FLHQW WKLFNQHVV PD FDXVH GHZ GULS page Model Power supply 1 LUH VSHF...

Страница 3: ...fans IWHU WKH OHDN WHVW DSSO LQVXODWLQJ PDWHULDO WLJKWO VR that there is no gap WARNING 7R DYRLG ULVN RI UH ÀDUH FRQQHFWLRQ VKRXOG EH LQVWDOOHG RXWGRRUV 5HXVDEOH PHFKDQLFDO FRQQHFWRUV DQG ÀDUHG MRLQWV DUH QRW DOORZHG indoors WARNING 7R DYRLG ULVN RI UH HPEHG RU SURWHFW WKH UHIULJHUDQW SLSLQJ WHUQDO GDPDJH RQ WKH UHIULJHUDQW SLSLQJ FDQ EH FDXVH RI UH Be sure to use wall hole sleeve C to prevent in ...

Страница 4: ... piping Downward slope Drain hose Soft hose I D 15 mm Drain hose Hard vinyl chloride pipe I D 30 mm Insert securely Different diameter joint 70 cm or more Fig 1 Fig 2 Fig 3 For future servicing give extra length to the connecting wires 0DNH HDUWK ZLUH D OLWWOH ORQJHU WKDQ RWKHUV More than 60 mm Do not fold the excess wire or cram it into VPDOO VSDFH 7DNH FDXWLRQ QRW WR GDPDJH the wires Be sure to ...

Страница 5: ... 0RUH WKDQ PP For future servicing give extra length to the connecting wires Be sure to attach each screw to its correspondent terminal when securing the cord DQG RU WKH ZLUH WR WKH WHUPLQDO EORFN 35 mm 15 mm Lead wire Outdoor unit connection Connect pipes to stop valve pipe joint of the outdoor unit in the same manner applied for indoor unit RU WLJKWHQLQJ XVH D WRUTXH ZUHQFK RU VSDQQHU DQG XVH WK...

Страница 6: ...ndle High Adapter for preventing the EDFN À RZ Charge hose for R32 R410A Close Open Hexagonal wrench Precautions when using the control valve When attaching the control valve to the service port valve core may deform or loosen if excess pressure LV DSSOLHG 7KLV PD FDXVH JDV OHDN Service port Body Close R32 Open Control valve A When attaching the control valve to WKH VHUYLFH SRUW PDNH VXUH WKDW WKH...

Страница 7: ...CATION AND MAINTENANCE When pumping down the refrigerant stop the compressor before disconnecting the refrigerant pipes The compressor may burst if air etc get into it WARNING 5 1 REMOVING AND INSTALLING THE PANEL ASSEMBLY Removal procedure Fig 1 2 1 5HPRYH WKH VFUHZV ZKLFK WKH SDQHO DVVHPEO 2 Open the front panel 5HPRYH WKH VFUHZV ZKLFK WKH SDQHO DVVHPEO 4 Close the front panel 5HPRYH WKH SDQHO D...

Страница 8: ...es The thin part of the connecting cable should be stored and placed where customers cannot touch it Air conditioner Thin part of the connecting cable Place this part where customers cannot touch it 7KLFN SDUW RI WKH FRQQHFWLQJ FDEOH Indoor electronic control P C board CN105 for INTERFACE CN104 for CONNECTOR CABLE Connecting 1 Remove the panel and the lower right corner box 2 Open the covers of th...

Отзывы: