4-1. PURGING PROCEDURES AND LEAK TEST
N" "# "" # !
"" # "
2) Connect gauge manifold valve and vacuum pump to service port of stop valve on the gas
#
4-2. TEST RUN
1) Insert power supply plug into the power outlet and/or turn on the
<
x zMU%#HMMR$#zQ!
! ##@' ;##
< "': $ L
Q# TQ# $
8H
@! $ zMU% " Rz=
##N# #
4) Checking the remote (infrared) signal reception
• Press the OFF/ON button on the remote controller (3) and
< #
x MLMV##
• Once the compressor stops, the restart preventive device
operates so the compressor will not operate for 3 minutes to
Stop valve for
GAS
Stop valve cap
!}.
8V$''
to 300 kgf•cm)
Vacuum pump (or the vacuum
pump with the function to
"<j
Gauge manifold valve
(for R32, R410A)
Compound pressure gauge
(for R32, R410A)
–
''~x
(
–
760 mmHg)
Handle
Low
Handle High
Adapter for
preventing the
<j
Charge hose
(for R32, R410A)
*Close
*Open
Precautions when using the control valve
When attaching the control valve
to the service port, valve core may
# #
! <
Service port
S
Close
<R32>
Open
Control
valve
A
When attaching the control valve to
the service port, make sure that the
valve core is in closed position, and
Q =
part A or turn the body when valve
Service port cap
!}@?
??V$140 to
180 kgf•cm)
*4 to 5 turns
@N"O:'' "
4) Check the vacuum with gauge manifold valve, then close gauge manifold valve, and stop
"
:R" # ~< #""
H ''~x{?.'
.N"#""}<# "# ""
Stop valve
for LIQUID
Caution:
Q# <$##zMU%
### V
To the user
Q# $< #
;# # $ " H "
""#N# "#
4. PURGING PROCEDURES, LEAK TEST, AND TEST RUN
Pressure gauge
(for R32, R410A)
Emergency operation
zMU%
Charge
hose
Make sure to re-
place the cap after
4-4. EXPLANATION TO THE USER
| MxzNQ!;V{;VU!N|H!;MVU$
$" $$
#$
N MxzNQ!;V{;VU!N|H!;MVU#
WARNING
8 = !
risks before opening the stop valves.
7) After refrigerant pipes are connected and evacuated, fully open all stop valves on both
# }M# #
N#T@$ ###S
}#M $ ##
####
!# "
10) Leak test
4-3. AUTO RESTART FUNCTION
! } #%
during operation, such as during blackouts, the function automatically starts operation in
" N#
#