3
3.2
[Fig. 3.2.1]
4
4.1
[Fig. 4.1.1]
A
Unit body
B
Lifting machine
C
Nuts (field supply)
D
Washers (accessory)
E
M10 hanging bolt (field supply)
5
5.3
[Fig. 5.1.1]
[Fig. 5.1.2]
[Fig. 5.3.1]
5.1
6
6.2
[Fig. 6.2.1]
2
A
Center of gravity
A
Indoor unit’s bottom surface
C
D
C
E
D
A
Air inlet
B
Refrigerant piping (liquid)
C
Refrigerant piping (gas)
D
Control box
E
Drain pipe
F
Air outlet
200
~
300
150
~
200
50
50
1350
730
450
470
more than 20
30
±
10
more than 20
more than 100
60
23
1324
23
37
1250
1100
1100
800
1034
B
C
D
A
A
E
Keep the service space for the maintenance from
the bottom when the heat exchanger is cleaned.
701
494
235
1034
1324
A
A
B
A
165
52
100
244
30
424
A
B
E
C
D
F
A
Access door
B
Electrical parts box
C
Air inlet
D
Air outlet
E
Ceiling surface
WT05749X01_p02.p65
09/10/14, 13:58
2