OPERATING PROCEDURE
PHOTOS
2. Removing the inverter assembly, inverter P.C. board
(1) Remove the cabinet and panels. (Refer to 1.)
(2) Disconnect the lead wire to the reactor and the following con-
nectors:
<Inverter P.C. board>
CN602 (R.V. coil)
(MUZ)
CN671 (Defrost thermistor
(MUZ)
, discharge temperature
thermistor and outdoor heat exchanger temperature
thermistor)
CN672 (Ambient temperature thermistor)
CN724 (LEV)
CN931, CN932 (Fan motor)
(3) Remove the compressor connector.
(4) Remove the screws fixing the relay panel.
(5) Remove the relay panel.
(6) Remove the ground wires and the lead wires of the inverter
P.C. board.
(7) Remove the screw of the PB support.
(8) Remove the inverter P.C. board from the relay panel.
Photo 4
3. Removing R.V. coil
(1) Remove the cabinet and panels. (Refer to 1.)
(2) Disconnect the following connector:
<Inverter P.C. board>
CN602 (R.V. coil)
(MUZ)
(3) Remove the R.V. coil.
Photo 5
71
Screws of the
PB support
Screws of the
relay panel
Inverter P.C.
board
Ground wires
Screw of the
relay panel
Screws
of the PB
support
Brazed parts of
4-way valve
Screw of the
R.V. coil
(MUZ)
OBH549F
Содержание Mr. Slim MUZ-GE15NA-1
Страница 5: ...5 MUZ GE24NA MUY GE24NA Piping Air outlet Drain outlet Air inlet back and side Drain hose OBH549F ...
Страница 13: ...13 MUZ GE09NA MUZ GE12NA 5 WIRING DIAGRAM MUZ GE09NA2 MUZ GE12NA2 OBH549F ...
Страница 14: ...14 MUZ GE09NAH MUZ GE12NAH MUZ GE09NAH2 MUZ GE12NAH2 OBH549F ...
Страница 15: ...15 MUY GE09NA MUY GE12NA MUY GE09NA2 MUY GE12NA2 OBH549F ...
Страница 16: ...16 MUZ GE15NA 1 MUZ GE15NA OBH549F ...
Страница 17: ...17 MUZ GE15NAH MUZ GE15NA2 OBH549F ...
Страница 18: ...18 MUY GE15NA MUZ GE15NAH2 OBH549F ...
Страница 19: ...19 MUY GE15NA 1 MUY GE15NA2 OBH549F ...
Страница 20: ...20 MUZ GE18NA MUZ GE18NA 1 OBH549F ...
Страница 21: ...21 MUZ GE18NAH MUY GE18NA OBH549F ...
Страница 22: ...22 MUY GE18NA 1 OBH549F ...
Страница 23: ...23 MUZ GE24NA OBH549F ...
Страница 24: ...24 MUY GE24NA OBH549F ...
Страница 73: ...73 OBH549F ...