OPERATING PROCEDURE
PHOTOS/FIGURES
3. Removing the indoor electric control P.C. board,
the receiver P.C. board and the display P.C.
board
(1) Remove the intake grille.
(2) Remove the side panel (L).
(3) Remove the electrical cover
and
(4 fixing screws)
(Photo 2).
(4) Partially slide the indoor electronic control P.C. board
out.
(5) Disconnect all the connectors and lead wires on the
board to remove the indoor electric control P.C. board.
(6) Remove the tabs at the top and bottom of lamp cover,
and open the lamp cover.
(7) Disconnect the connectors and lead wires, and remove
the receiver P.C. board and the display P.C. board.
4. Removing the heat exchanger and stabilizer
(1) Remove the grille.
(2) Remove the room temperature thermistor.
(3) Remove the tabs (2 places) in the center of stabilizer
and remove the drain pan (4 fixing screws).
(4) Remove the electrical cover
and
.
(5) Disconnect the connectors of the horizontal and vertical
vane motors.
(6) Remove the indoor coil thermistors (main and sub).
(7) Remove the drain cover (3 fixing screws).
(8) Remove the pipe band.
(9) Remove the heat exchanger (6 fixing screws).
(10) Remove the stabilizer (2 fixing screws).
5. Removing the horizontal and vertical vane
motors
(1) Remove the grille.
(2) Remove the drain pan.
(3) Remove the horizontal vane.
(4) Remove the cover of horizontal and vertical vane
motors (2 fixing screws).
(5) Remove the vertical vane motor (2 fixing screws) and
disconnect the connector (Photo 4).
(6) Remove the horizontal vane motor (2 fixing screws)
and disconnect the connector (Photo 4).
40
Photo 4
Photo 2
Photo 3
Drain pan
Fixing screws of the electrical box
Lamp cover
Fixing screws
of the lamp
cover
Fixing screw of the electrical box
Electrical cover
Electrical cover
Stabilizer
Motor cover of horizontal
and vertical vane motors
Heat
exchanger
Room temperature
thermistor
Drain pump
Float sensor
Drain cover
Vertical vane motor
Stabilizer
Horizontal vane motor
OBH802B