─
22
─
5
Unscrew the clamping screws, and remove the blower cover.
(Four PTT screws 4×16, indicated by
)
Precaution
• Since the blower (assembly) may drop off the blower case, remove
the lead wires first, and then slowly remove the blower cover.
Assembly precautions
• Replace the packing used in the disassembled section with a new
one.
• Take care not to twist the packing when installing it.
• When replacing the heater, attach the included fixing piece to the
position, indicated by
, with a screw (one PTT screw 4×16) to
prevent the blower from dropping off.
Blower cover
Blower (assembly)
6
Unscrew the clamping screws, and remove the heater (PTC).
(Two PTT screws 4×16, indicated by
)
Heater (PTC)
Assembly precaution
When installing the heater, set the heater as the lead wire comes
out from the right side.
Lead wire
Assembly precautions
• Hook the lead wire into the rib of the blower cover. (Indicated by
)
• Run the lead wires through the grooves of the blower cover.
(Indicated by
)
Make sure to match the size of the grooves and lead wires.
• Take care not to pinch the lead wires.
Upper groove (Bigger)
Lower groove (Smaller)
4
Unscrew the clamping screws, and remove the exhaust duct.
(Nine PTT screws 4×16, indicated by
)
Assembly precautions
• Replace the packing used in the disassembled section with a new
one.
• Take care not to twist the packing when installing it.
Exhaust duct
Содержание JT-SB216JSH2-H-NE
Страница 32: ... 32 83 82 81 84 85 86 JT SB216JSH2 W NE ...
Страница 40: ... 40 JT SB216JSH2 H NE 83 82 81 84 85 86 ...
Страница 48: ... 48 JT SB216JSH2 S NE 83 82 81 84 85 86 ...
Страница 56: ... 56 JT SB216KSN2 W NE 83 82 81 84 85 86 ...