PHOTOS
DISASSEMBLY PROCEDURE
OK
NG
NG
Flow switch
Flow switch
Flow switch
Pipe
Pipe
Pipe
Lead wire
Flow
Flow
Flow
74
75
7. How to remove the flow switch
(1) Remove the front panel. (Refer to Procedure 1.)
(2) Remove the control box cover. (Refer to Procedure 3.)
(3) Disconnect the CN2F connector on the controller board.
(Photo 4-1)
(4) Release the lead wire from the 5 bands and 2 cable
straps. (Photos 10-1, 10-)
(5) Close (OFF) the strainer valve handle (under).
(Photo 10-)
w
When the valve handle is stiff, remove the handle and
turn the vertical stem 90 degree mainly by using a span
-
ner. (Photo 5-)
(6) Remove the flow switch by loosening the nut. (Photo 7-1)
w
When reinstalling the flow switch, use a new O-ring.
(Photo 7-)
Note: To ensure the correct functioning of the flow switch,
check the following when installing it:
▪ The flow switch paddle is set perpendicularly to the
water flow. (Photo 7-2)
▪ The lead wire of the flow switch points toward the left-
hand. (Photo 7-1)
▪ The lead wire runs parallel to the water pipe.
(Figure 7-1)
Photo 7-1
Photo 7-2
Figure 7-1
Nut
Flow switch
Flow direction
Flow switch paddle
O-Ring
Lead wire
OCH531
Содержание ecodan EHPT20X- VM2HB
Страница 89: ...89 OCH531 ...