![Mitsubishi Electric E1070 Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/mitsubishi-electric/e1070/e1070_installation-manual_238475010.webp)
Installation
10
Mitsubishi Electric, MA00776C
3. Secure the operator panel in position, using all the fastening holes and the
provided brackets and screws:
4. Connect the cables in the specified order.
Use an M5 screw and a grounding conductor (as short as possible)
with a cross-section of minimum 2.5 mm
2
.
5. Carefully remove the laminated film over the operator panel display, to avoid
static electricity that could damage the panel.
x 6
0.5 - 1.0 Nm
B
C
D
A
Caution
Ensure that the operator panel and the controller system have the
same electrical grounding (reference voltage level), otherwise errors
in communication may occur.
Caution
- Use only shielded communication cables.
- Separate high voltage cables from signal and supply cables.
Caution
- The operator panel must be brought to ambient temperature
before it is started up. If condensation forms, ensure that the
operator panel is dry before connecting it to the power outlet.
- Ensure that the voltage and polarity of the power source is correct.
24V DC
RS422/RS485
24V DC
1
CF
CARD
B
A
C
D
RS232
Controller
Power
Ethernet
Содержание E1070
Страница 1: ...MITSUBISHI ELECTRIC E1070 Installation manual MA00776C 2008 07 English ...
Страница 4: ...Table of Contents Mitsubishi Electric MA00776C ...
Страница 8: ...Safety Precautions 8 Mitsubishi Electric MA00776C ...
Страница 12: ...Installation 12 Mitsubishi Electric MA00776C ...
Страница 14: ...Technical Data 14 Mitsubishi Electric MA00776C ...
Страница 18: ...Operator Panel Drawings 18 Mitsubishi Electric MA00776C 5 2 E1070 Outline Drawing No S 5031 Date 2004 10 14 ...
Страница 19: ...Operator Panel Drawings Mitsubishi Electric MA00776C 19 5 3 E1070 Text Strip Drawing No S 5027 Date 2004 08 12 ...
Страница 20: ...Operator Panel Drawings 20 Mitsubishi Electric MA00776C ...