29
8. REMOVING THE VANE MOTOR
(1) Remove the front panel. (Refer to procedure 2)
(2) Remove the screw of the electrical parts box cover, and
remove the cover.
(3) Remove the 2 screws of the vane motor.
Disconnect the relay connector and remove the motor
from the shaft.
(4) Disconnect the vane motor connector (CN5V) on the
indoor controller board.
Photo 10
Heat exchanger
Vane motor
Nozzle assembly
9. REMOVING THE LIQUID PIPE THERMISTOR AND GAS
PIPE
THERMISTOR
(1) Remove the front panel. (Refer to procedure 2)
(2) Remove the electrical box cover. (See the Photo 2)
(3) Remove the water cut. (See the Photo 3)
(4) Cut the wiring fixed band.
(5) Remove the liquid pipe thermistor and gas pipe thermistor.
(See the Photo 10)
(6) Disconnect the connector (CN29) (CN21) on the indoor
controller board.
Photo 11
Heat exchanger
Vane motor fixing
screws
Gas pipe
thermistor
Liquid pipe
thermistor
Electrical box
PHOTOS & ILLUSTRATIONS
OPERATION PROCEDURE
OCH461B