PHOTOS
OPERATION PROCEDURE
Copyright 2012 MITSUBISHI ELECTRIC CORPORATION
Distributed in Apr. 2012 No. OCH518
Made in Japan
New publication, effective Apr. 2012
Specifications are subject to change without notice.
HEAD OFFICE : TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU TOKYO 100-8310, JAPAN
8. REMOVING THE HEAT EXCHANGER AND LEV
(1) Remove the panel and the corner box. (Refer to procedure
1)
(2) Remove the electrical box (Refer to procedure 3) and the
nozzle assembly (Refer to procedure 4.).
(3) Remove the water cut.
(4) Remove the pipe thermistors (Refer to procedure 7).
(5) Disconnect the connector (CN60) on the indoor controller
board and the connector for ground wire.
(6) Remove 3 screws fixing the left side of the heat exchanger.
(See Photo 9)
(7) Remove the heat exchanger with LEV.
9. REMOVING THE ROOM TEMPERATURE THERMISTOR
(1) Remove the panel and corner box. (Refer to procedure 1)
(2) Remove the electrical box covers.
(3) Remove the room temperature thermistor.
(4) Disconnect the connector (CN20) on the indoor controller
board.
Photo 11
Photo 12
Indoor controller
board
Room temp.
thermistor (TH21)
Photo 13
Heat exchanger
Water cut
LEV
Connect for ground
Heat exchanger
LEV