5.3.  Water treatment and quality control

To preserve water quality, use the closed type of water circuit. When the circulating
water quality is poor, the water heat exchanger can develop scale, leading to a
reduction in heat-exchange power and possible corrosion. Pay careful attention to
water processing and water quality control when installing the water circulation
system.

Removing of foreign objects or impurities within the pipes.
During installation, make sure that foreign objects, such as welding fragments,
sealant particles, or rust, do not enter the pipes.

Water Quality Processing

2

Water quality standard

6. Electrical work

Consult all related regulations and power companies beforehand.

Warning:

Electrical work should be handled by qualified electrical engineers in
accordance with all related regulations and attached instruction manuals.
Special circuits should also be used. If there is a lack of power capacity or a
deficiency in electrical work, it may cause a risk of electric shock or fire.

Connect all wires securely.

Fix power source wiring to control box by using buffer bushing for tensile force
(PG connection or the like).

[Fig. 6.0.1] (P.7)

CMH-WM250V-A
CMH-WM350V-A
CMH-WM500V-A

Never connect the power cable to the terminal board for control cables.
(Otherwise it may be broken.)

Be sure to wire between the control wire terminal boards for indoor unit,
outdoor unit and hydro unit.

Use non-polarized 2-wire as transmission cables.
Use 2-core shielding cables (CVVS, CPEVS) of more than 1.25 mm

2

 in diameter as

transmission cables.

The switch capacity of the main power to hydro unit and the wire size are as follows:

For other detailed information, refer to the outdoor unit installation manual.

Power supply cords of appliances shall not be lighter than design 245 IEC 53 or
227 IEC 53.

A switch with at least 3 mm contact separation in each pole shall be provided by
the Air conditioner installation.

When air flow decrease is detected of a circulation fan beside the hydro unit
installed at the height of less than 1.8 m from the ground, the system must be
powered off within 10 seconds from the detection. Before powering off the
system, connect the contactor to the power cable of the outdoor unit and open
the contactor. For the connection procedures, specifications, and installation
location of the contactor, refer to the manual of the outdoor unit.

Caution:

Do not use anything other than the correct capacity fuse and breaker. Using
fuse, conductor or copper wire with too large capacity may cause a risk of
malfunction or fire.
Ensure that the outdoor units are put to the ground. Do not connect the earth
cable to any gas pipe, water pipe, lightening rod or telephone earth cable.
Incomplete grounding may cause a risk of electric shock.

7. Setting addresses and operating units

The address switch of each hydro unit is set to “000” when shipped from the factory.

Set the address switch to an address that equals the address of the outdoor units
that are connected to the hydro unit plus 1.

Please refer to the outdoor unit installation manual.

8. Test run

Before commencing a test run please check the 
following:

After installing, piping and wiring the indoor units and hydro units, check
to see again that there is no refrigerant leakage, water leakage, the indoor
unit inlet and outlet piped backwards, and no slack on power and control
cables.

Use a 500 V tester to check that there is an insulation resistance of more
than 1.0 M

 between the power terminal block and the ground. If it is less

than 1.0 M

, do not operate the unit.

When water has been supplied to the water pipework, purge the system of air.
The details of air purging can be found separately in the water circuit
maintenance manual.

Caution:

Never measure the insulation resistance of the terminal block for any
control cables.

Incomplete purging of the air in the system, closing of the valves upstream
or down stream of the pump etc. may cause the pump to operate with no
water flow and thus lead to pump failure.

Ensure that the power is off when replacing a pump. Do not remove or
attach the pump connector with the power on. Otherwise pump will break.
After turning off the power, wait 10 minutes before commencing work.

1

Depending on the quality of the cold-temperature water used in the aircondi-
tioner, the copper piping of the heat exchanger may corrode.
Regular water quality processing is recommended.
If a water supply tank is installed, keep air contact to a minimum, and keep
the level of dissolved oxygen in the water no higher than 1mg/

.

Items

Low to mid-range 

temperature water system

Tendency

Recirculating 

water

[20<T<60°C]

[68<T<140°F]

Make-up

water

Corrosive

Scale- 

forming

S

ta

ndar

d i

tems

pH (25°C) [77°F]

7.0 – 8.0

7.0 – 8.0

Electric conductivity

(mS/m) (25°C) [77°F]

30 or less

[300 or less]

30 or less

[300 or less]

(µ s/cm) (25°C) [77°F]

Chloride ion

(mg Cl-/

) 50 or less 50 or less

Sulfate ion

(mg SO4

2-

/

) 50 or less 50 or less

Acid consumption (pH4.8)

50 or less 50 or less

(mg CaCO

3

/

)

Total hardness

(mg CaCO

3

/

) 70 or less 70 or less

Calcium hardness

(mg CaCO

3

/

) 50 or less 50 or less

Ionic silica

(mg SiO

2

/

) 30 or less 30 or less

Re

fer

ence ite

m

s

Iron

(mg Fe/

) 1.0 or less 0.3 or less

Copper

(mg Cu/

) 1.0 or less 0.1 or less

Sulfide ion

(mg S

2-

/

)

not to be 
detected

not to be 
detected

Ammonium ion

(mg NH

4

+

/

) 0.3 or less 0.1 or less

Residual chlorine

(mg Cl/

) 0.25 or less 0.3 or less

Free carbon dioxide

(mg CO

2

/

) 0.4 or less 4.0 or less

Ryzner stability index

6.0 – 7.0

Reference: Guideline of Water Quality for Refrigeration and Air Conditioning

Equipment. (JRA GL02E-1994)

3

Consult with a specialist about water quality control methods and calculations
before using anti-corrosive solutions.

A

Control box

B

Power source wiring

C

ø32 hole (closed rubber bushing)

D

Transmission wiring

E

Clip cables here

Switch (A)

Molded case 

circuit breaker

Earth leakage 

breaker

Wire size

Capacity

Fuse

16

16

20 A

20 A 30 mA

0.1 s or less

1.5 mm

2

WT09052X01_en.book  15 ページ  2019年1月17日 木曜日 午前10時49分

Содержание City Multi CMH-WM250V-A

Страница 1: ... εγχειρίδιο εγκατάστασης πριν αρχίσετε την εγκατάσταση της μονάδας κλιματισμού tr MONTAJ ELKİTABI Emniyetli ve doğru biçimde nasıl kullanılacağını öğrenmek için lütfen klima cihazını monte etmeden önce bu elkitabını dikkatle okuyunuz 中 简 安装手册 为了安全和正确地使用本空调器 请在安装前仔细阅读本安装手册 sk NÁVOD NA INŠTALÁCIU Pre bezpečné a správne použitie si pred inštalovaním klimatizačnej jednotky prosím starostlivo prečítajt...

Страница 2: ...mation contact your local distributor Item Piping in the figure Max length Max equivalent length Total piping length A A B C D E a b c d e f g 1000 Farthest indoor unit from outdoor unit L1 A A C D E g A B c 165 190 Between outdoor unit and hydro unit refrigerant pipework A 110 Farthest indoor unit from hydro unit L3 A C D E g A B c 60 60 Height between outdoor unit and indoor unit outdoor unit ab...

Страница 3: ...Connecting pipe diameter of hydro unit If the connecting pipe diameter of hydro unit differs from that of outdoor unit expand or reduce the pipe diameter at the inlet of the hydro unit Hydro unit Unit model Model name Outdoor unit side PUHY M200 CMH WM250V A PUHY M250 1 2 PUHY M300 3 CMH WM350V A 4 PUHY M350 PUHY M400 5 CMH WM500V A PUHY M450 PUHY M500 Hydro unit Unit model Model name Outdoor unit...

Страница 4: ...r covering B If a polyethylene cover is used as an outer covering asphalt roofing is not necessary Insulation material A Glass fiber Steel wire Adhesive Heat resistant polyethylene foam Adhesive tape Outer covering B Indoor Vinyl tape Under the floor and exposed Waterproof hemp cloth Bronze asphalt Outdoor Waterproof hemp cloth Zinc plate Oily paint A Downward slope 1 100 or more B Drain hose C Un...

Страница 5: ...ire C Blown asphalt D Base paper E Pipe F Glass wool Note Absorbent material G Asphalt felt H Cotton tape After wrapping it around a pipe brush polyester synthetic resin over the tape Fig 5 2 1 A B C D E Fig 5 2 2 A Adhesive Completely fill joints of foam polystyrene pipe insulation and a gap between a pipe and foam polystyrene pipe insulation with adhesive B Pipe C Form polystyrene pipe insulatio...

Страница 6: ...ter pipe supply pipe B Bind here using band or tape C Galvanized steel sheet cover D Soldering E Caulking waterproof material elastomeric sealant F Mortal waterproofing membrane G Concrete 150 mm A B C D C A D A Sleeve B No thermal insulation C Thermal insulation materials D Pipe Fig 5 2 5 Thermal and cold insulation work on a pipe penetrating through a beam 250 mm A B C D E Fig 5 2 6 A Pipe B Hea...

Страница 7: ... B D E C A Control box B Power source wiring C ø32 hole closed rubber bushing D Transmission wiring E Clip cables here Fig 6 0 1 CMH WM250V A CMH WM350V A CMH WM500V A WT09052X01_en book 7 ページ 2019年1月17日 木曜日 午前10時49分 ...

Страница 8: ...y this company may lead to damage fire explosions etc Do not spray water on electrical parts This could lead to shorting fire smoke electrical shock unit failure etc Do not create a situation where the refrigeration circuit is sealed yet incomplete with oil or refrigerant in the system This may result in an explosion Do not touch electrical components during or directly after operation This may le...

Страница 9: ...ital communication station or similar place provide sufficient protection against noise Sound pressure level does not exceed 70 dB A However inverter equipment private power generator high frequency medical equipment or radio communication equipment may cause the air conditioner to operate erroneously or fail to operate On the other hand the air conditioner may affect such equipment by creating no...

Страница 10: ...ater provide sufficient space for maintenance accordingly For details refer to the Data Book or installation manual for the panel heater Warning Be sure to install the unit in a place that can sustain the entire weight If there is a lack of strength it may cause the unit to fall down resulting in an injury Caution Be sure to install the unit horizontally Install the hydro unit level less than 1 ti...

Страница 11: ...ng Fig 4 1 1 P 3 Note Be sure to use non oxidative brazing Refrigerant piping connection examples Obtain joints and elbows on site as necessary according to the pipe diameter and connect the pipes as shown in the figures below Fig 4 1 2 P 4 1 When routing the pipes through the front of the unit 2 When routing the pipes through the bottom of the unit 3 Pipe connection port and connecting pipe Model...

Страница 12: ...hen certain specifications presented by the client must be met ensure that they also meet the specifications on the chart above The brazed connections must be covered with insulation with its seam facing upward and fastened with the bands 4 4 Drain piping work Drain or condensation water will be discharged from hydro units during test run If this will be a problem install a separately sold drain p...

Страница 13: ...plied strainer in the inlet pipe on the unit to keep foreign objects e g bolts and stones out of the water side heat exchanger Route the piping so that the pipes will not interfere with replacement of internal components e g pumps of the unit 5 2 Water pipe insulation 1 Thermal insulation work on pipes Cold hot water pipes require thermal insulation to prevent condensation on the pipe surface whil...

Страница 14: ...ystem and the lowest indoor unit m 100 MPa C Vertical separation between the top of the system and the hydro unit m 100 MPa A D 0 25 0 9 d B D 0 25 0 9 e C D 0 25 0 7 f The design pressure of the expansion vessel is 1 1 A C MPa or above Calculate the tank volume by assigning D that satisfies d to f to formula c Please choose ε for using antifreeze solution on the type and temperature range used ε ...

Страница 15: ...factory Set the address switch to an address that equals the address of the outdoor units that are connected to the hydro unit plus 1 Please refer to the outdoor unit installation manual 8 Test run Before commencing a test run please check the following After installing piping and wiring the indoor units and hydro units check to see again that there is no refrigerant leakage water leakage the indo...

Страница 16: ...7 WEIGHT YEAR OF MANUFACTURE IP CODE SERIAL No kg IP24 HYDRO UNIT MAXIMUM WATER PRESSURE 0 8MPa 8 0bar ALLOWABLE PRESSURE Ps 4 15MPa 41 5bar REFRIGERANT R32 RATED CURRENT A A RATED INPUT RATED CURRENT RATED INPUT Cooling Cooling FREQUENCY Hz UNIT RATING 220 230 240 50 60 50 60 50 60 H MODEL V kW kW Heating Heating WT09052X01_en book 16 ページ 2019年1月17日 木曜日 午前10時49分 ...

Страница 17: ...WT09052X01_en book 17 ページ 2019年1月17日 木曜日 午前10時49分 ...

Страница 18: ...WT09052X01_en book 18 ページ 2019年1月17日 木曜日 午前10時49分 ...

Страница 19: ...WT09052X01_en book 19 ページ 2019年1月17日 木曜日 午前10時49分 ...

Страница 20: ...the following EU regulations Low Voltage Directive 2014 35 EU Electromagnetic Compatibility Directive 2014 30 EU Machinery Directive 2006 42 EC Please be sure to put the contact address telephone number on this manual before handing it to the customer HEAD OFFICE TOKYO BLDG 2 7 3 MARUNOUCHI CHIYODA KU TOKYO 100 8310 JAPAN WT09052X01_en book 20 ページ 2019年1月17日 木曜日 午前10時49分 ...

Отзывы: