
–100–
6
6
5
4
3
2
1
5
4
3
2
1
2
5
1
3
4
6
Brown
Red
Blue
Orange
Yellow
White
Brown
Red
Blue
Orange
Yellow
White
To
LEV
10k
Ω
LED
(Self-diagnostic monitor)
Measured data
Signal
Heat source unit MAIN board SW1 setting
LEV 1 pulse
LEV 3 pulse
BC controller bypass
output superheat
BC controller
intermediate subcool
BC controller liquid
subcool
(Solenoid Valve Troubleshooting Flow)
–
–
SH12
SC16
SC11
Start
Visually check for disconnection between connec-
tors and terminals, and confirm correct lead colors.
Intermediate
connector
Controller
board
Remove connectors from the board and
use a tester to check conduction.
• Check between connectors 1-3-5 and 2-
4-6.
Use a tester to measure resistance
between each coil (red-white, red-orange,
brown-yellow, brown-blue).
Correct value is: 150
Ω±
10%
Adjust, repair.
Check for the following:
LEV full open: ticking sound
LEV full closed: no sound
Change LEV
OK?
Confirm if LEV is closed fully.
Attach check LEDs
illustrated nearby to board
connectors and confirm
that LEDs light for 10
seconds.
Change the
board.
1
ON
2 3 4 5 6 7 8 9 10
1
ON
2 3 4 5 6 7 8 9 10
1
ON
2 3 4 5 6 7 8 9 10
1
ON
2 3 4 5 6 7 8 9 10
1
ON
2 3 4 5 6 7 8 9 10
OK?
OK?
Change LEV
Correction.
OK?
OK?
Change LEV
OK?
End
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Содержание CITY MULTI CMB-P1010V-E
Страница 15: ... 12 RELAY board ...
Страница 16: ... 13 BC controller CNTR CN02 M NET transmission CN03 CN12 Power supply 1 EARTH 3 N 5 L SW4 SW2 SW1 BC board ...
Страница 17: ... 14 RELAY 10 board RELAY 4 board ...
Страница 38: ... 35 ...
Страница 96: ... 93 ...
Страница 151: ......
Страница 152: ......
Страница 153: ......