- 37 -
8.2
Preparation for on-site adjustment
(Same as section 7.2 “Preparation for on-site adjustment”)
Have the following tools and documents ready before performing on-site adjustment and a test run.
Item
Description
Notes
Reference
Air conditioning control system diagram
Group configuration, IP address, Control item, and
etc.
Instruction Book that came with BAC-HD150
(This document)
Instruction Book that came with Setting Tool
BAC-HD150 Installation Manual
Relevant air-conditioner and controller’s
Instructions Books and Installation Manuals
Miscellaneous
BACnet
®
device list Documents related to
notification items, destinations, and methods.
Tools and parts
Computer
For Setting Tool
USB memory
For setting data backup
Installation CD for the Setting Tool
Setup disk
HUB
For connection to Setting Tool
Two LAN cables (category 5 or above) (straight cable)
For connection to Setting Tool
General tools such as a driver
Tester
Use to check wiring and voltage.
Miscellaneous
㩷㩷
㩷
㩷
㩷
㩷
BAC-HD150
HUB
㩷
㩷
㩷
㩷
㩷
HUB
HUB1
LAN1
LAN
LAN2
PAC-YG50ECA
BACnet
®
BACnet
®
M-NET
M-NET
M-NET
PAC-YG50ECA
M-NET
PAC-YG50ECA
M-NET
BMS
Outdoor unit
Outdoor unit
Indoor unit
Indoor unit
ME remote controller
ME remote controller
LOSSNAY
LOSSNAY
Step-1
Step-2
24VDC
AG-150A
PAC-SC51KUA
WT05542X04.book Page 37 Wednesday, July 3, 2013 12:13 PM