DISASSEMBLY SEQUENCE
1. First detach the walls, then detach the tent lines and remove anchors.
2. Pull out the anchors in the basis of the tent (remove the weights or remove the
sleeve anchors).
3. Ensure that the base of the tent and internal legs are clean. The sand and clay
accumulated on the frame can prevent the legs from sliding in. Press the lock
located on the leg, slide in the inner leg and let the tent down. Note! When
letting it down, the installers should be on the same side of the tent.
4. Unfasten the clip buckles.
5. For Octa Optima II in sizes 5×5 m, 6×6 m push the blockade button and lower
the mast.
6. Release the locks in the corner and center legs.
7. Holding the lower sabres, fold the structure.
8. Remove the lining from the structure.
9. Packe the elements of the tent into a bag.
The Producer reserves the right to implement changes to above information.
THE PRODUCER:
MITKO Sp. z o.o.
Osiedle 1 Maja 16G | 44-304 Wodzisław Śląski | Poland | TIN: PL6470509572
Tel. +48 32 444 66 16 | Fax: +48 32 757 09 20 | [email protected] | www.mitko.pl
Содержание OCTA GO
Страница 7: ...7 40 ENGLISH Fig 2 Mounting process ...
Страница 13: ...13 40 DEUTSCH Zeichnung 2 Montageablauf des Zeltes ...
Страница 19: ...LIETUVOS 19 40 2 pav Palapinės montavimo eiga ...
Страница 25: ...25 40 SLOVENSKY Obrázok 2 Priebeh montáže nožnicového stanu ...
Страница 31: ...31 40 ČESKÝ Obrázek 2 Průběh montáže nůžkového stanu ...
Страница 37: ...37 40 POLSKI Rys 2 Przebieg montażu namiotu ekspresowego ...
Страница 39: ...39 40 POLSKI ...