Step 12
After PVC cement has been applied, push the riser pipe into
the bottom fitting and align with the “T” fitting so the “T”
fitting fits into the 1
1
/
4
” hole at the top of the riser pipe.
Step 13
Apply teflon tape sealer to the valve threads.
523548_Miraco_3410-4:Layout 1 3/19/14 11:47 PM Page 6