background image

32

Failing this, contact your installer to ensure that the product
has been installed and commissioned in full accord with our
detailed installation instructions. Our Customer Services is
available, on the number shown below, to advise you or your
installer.

If this does not resolve the difficulty, contact our Customer Services
who will give every assistance and, if appropriate, arrange for our
local Service Engineer or Agent to call on a mutually agreeable
date.

If, through circumstances beyond our control, we are unable to
provide this cover we will, with prior agreement, authorise a
competent local installer to attend.

Within the Guarantee period there will be no charge for the
parts or labour insofar as a fault with our product is concerned.
However, it is important to appreciate that our Guarantee
extends to our product only and that it does not cover difficulties
arising from incorrect installation or misuse.

During a Service visit a responsible person – familiar with the
purpose of the visit – should be present. Should our Service
Engineer or Agent be unable to gain access at the pre-
arranged time a callout charge may be made.

Payment for Service visits, if applicable, should be made
directly to the Service Engineer or Agent, using either Visa,
Access or a cheque supported by a banker’s card.

To contact us:-
For England, Wales and Scotland

Telephone 01242 262888 (20 Direct Lines)
and ask for Caradon Plumbing Solutions Customer
Services

 For advice on product maintenance

 To order spare parts

 To arrange a service visit

 For product advice and problem solving

 To order Installation, Operation and Maintenance Guides

 For your feedback on our products or services

By Fax:

(01242) 282595

By Post:

Caradon Plumbing Solutions, Cromwell Road
Cheltenham, Gloucestershire, GL52 5EP.

For Northern Ireland

By Phone: 01232 401909 – Monday to Friday 9am–5pm
By Fax:

01232 401235 – 24 Hours

By Post:

Wm. H. Leech & Son Ltd, Unit 3,
34, Montgomery Road, Belfast, BT6 9HL.

For Eire

By Phone: Dublin 01 4591344 – Monday to Friday 9am–
5pm
By Fax:

Dublin 01 4592329 – 24 Hours

By Post:

Modern Plant Ltd, Otter House, Naas Road,
Clondalkin, Dublin 22, Eire.

P3499 (J92E, F, G)

© Caradon Mira Limited, September 1999

Mira  Showers

Caradon Mira Ltd
Cromwell Road,
Cheltenham GL52 5EP.

BS EN ISO 9001 : 1994

Reg. No.  FM 14648

Mira is a registered trade mark of subsidiaries
of Caradon Mira Limited.
The company reserves the right to alter product
specifications without notice.

Guarantee

Caradon Plumbing Solutions guarantee this product
against any defect of materials or workmanship for one
year (three years for the Mira Excel thermostatic range)
from the date of purchase, provided that the product has
been installed correctly and used and maintained in
accordance with the instructions supplied.

Any part found to be defective during the guarantee
period will be replaced or repaired – at our option – without
charge, provided that the product has been properly used
and maintained.

The product should not be taken apart, modified or
repaired except by a person authorised by Caradon
Plumbing Solutions.

Your statutory rights are in no way affected by this
guarantee.

After  Sales  Service  – how  we  can
help you

Caradon Plumbing Solutions have a team of expert staff
ready to provide assistance, should you experience any
difficulty with your Mira shower.

The Caradon Plumbing Solutions Customer Services is
available to give you advice on any problem encountered.
Should the problem be unable to be resolved by advice,
we will offer either a replacement part to be sent to you,
or for one of our Service Engineers or Agents to call.

Spare Parts

At Caradon Plumbing Solutions we keep a stock of all
functional parts of our products for up to ten years from
the date of final manufacture of the product.

If during that period, our stock of a particular part is
exhausted we will, as an alternative, provide an equivalent
new product or part at a price equating to the cost of
repair to the old, bearing in mind the age of the product.

Caradon Plumbing Solutions will normally despatch
spare parts within two working days and by 1st class
post. In the interests of customer safety, spares that
require exposure to areas of mains voltage can only be
sent to a competent person.

Payment for such parts – if applicable – can be made by
Visa or Access over the phone at the time of ordering.
Should payment by cheque be preferred a pro forma
invoice will be sent.

Customer Care Policy

If within a short time of installation the product does not
function correctly, first check with the Installation, Operation
and Maintenance Guide to see if the difficulty can be
overcome by simple home maintenance.

www.mira-showers.co.uk

Section

Customer Service

Содержание Sprint 7.5

Страница 1: ...1 Maintenance Guide Operation B Installation ELECTRIC SHOWERS THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER 7 5 8 5 and 9 5 kW Power Low Flow Temperature Stop Start...

Страница 2: ...Contents Checklist 7 4 Dimensions 8 5 Wiring Diagram 9 6 Specifications 10 7 Installation Requirements 10 8 Installation 14 9 Commissioning 17 10 Operation 19 11 Maintenance 23 12 Fault Diagnosis 28 1...

Страница 3: ...dset with three different spray actions start force and soothe Individual lights indicate POWER and LOW FLOW Supplied complete with flexible hose adjustable clamp bracket assembly slide bar and suppor...

Страница 4: ...stnotbefittedwhereitmaybeexposedtofreezing conditions 1 7 If water leaks from the pressure relief valve maintenance will be required before the Mira Sprint can be safely used 1 8 DO NOT fit any form o...

Страница 5: ...of these instructions and retain this guide for later use 2 2 Pass on this guide in the event of change of ownership of the installation site 2 3 Follow all warnings cautions and instructions containe...

Страница 6: ...ng Particular consideration should be given to the young the elderly the infirm or anyone inexperienced in the correct operation of the controls 2 8 When this Mira Sprint has reached the end of its se...

Страница 7: ...o confirm that the parts are included 2 Documentation 1 x Installation Operation and Maintenance Guide 1 x Installation Template 1 x Customer Support Brochure Section 3 Pack Contents Checklist 1 Mira...

Страница 8: ...8 Power Low Flow Temperature Stop Start Section 4 Dimensions 203 5 mm 342 mm 79 mm...

Страница 9: ...ion Load P E N Solenoid Valve Pressure Power Selector Switch Low Flow Neon Inlet Connector Wiring Diagram Section 5 Power On Neon 92 Green 91 Green 90 Blue 89 Brown 96 Red 97 Brown 99 Brown 93 Black 9...

Страница 10: ...bar up to a maximum static inlet pressure of 10 bar 1 2 The Mira Sprint is normally connected to the cold water mains fed supply However thewatersupplycanbetakenfromacoldwaterstoragecistern provided...

Страница 11: ...e when soldered fittings are used pre solder the pipework and fittings before connecting them to the inlet connector assembly 1 10 TheMiraSprintisfittedwitha BSPmaleoutletthread toacceptaMirashower ho...

Страница 12: ...he Mira Sprint Voltage drop due to local heavy demand will reduce the shower s performance 2 2 TheMiraSprint mustbeearthedbyconnectingthesupply cableearthconductor to the earth terminal Supplementary...

Страница 13: ...guide only the following maximum permissible lengths are given for 6 mm2 cable protected by a 40A MCB type B and allowing for a 5 Volt drop Sprint 7 5 kW 240 V AC at 240 V 22 Metres Sprint 8 5 kW 240...

Страница 14: ...vice tunnel 1 5 Determine the direction of the inlet water supply top falling bottom rising or back inlet Note Make sure that the back inlet does not go directly back into the wall Use a soldered elbo...

Страница 15: ...Connector Assembly Cold Water Supply Pipe Terminal Block Cover Retaining Screw Holes For Cover Retaining Screws The inlet connector assembly can be swivelled to suit the supply Do not fit the Mira Spr...

Страница 16: ...Connect the conductors firmly into the terminal block Make sure that the bare cores of each conductor are securely trapped within each conductor clamp L Red wire N Black wire E Yellow Green sleeved wi...

Страница 17: ...to the low position 1 5 Switch on the electrical supply at the double pole switch The POWER neon will provide a visual indication that the electrical supply is connected 1 6 Press the START button Che...

Страница 18: ...he TOP knob to the medium position The temperature of the water should rise slightly Allow a few seconds for the warm water to reach the handset this shows that the MEDIUM power setting is operatingco...

Страница 19: ...re of the incoming cold water supply and or fluctuationsinmainselectricalvoltage willrequirethe TEMPERATURE knobto be adjusted as necessary 1 5 The Mira Sprint requires a minimum maintained running pr...

Страница 20: ...rise Showering temperature minus the incoming cold water temperature Example For the Mira Sprint 7 5 kW on full power setting with an incoming water supply at10 Candashoweringtemperatureat45 C thetemp...

Страница 21: ...handset 2 5 IfnecessaryturntheBOTTOMcontrolknobslowlytoadjusttemperature Allow 10 15 seconds for the adjusted temperature to reach the handset The control knob operates through approximately of a tur...

Страница 22: ...22 COLD Power Low Flow Temperature Stop Start Stop Start Hotter Cooler High Medium Low Press to Start Stop...

Страница 23: ...ce Only a competent tradesperson should remove the cover 3 Flow Valve and Switch Assembly Removal and Installation WARNING Isolate the electrical and water supplies before removing the cover Mains ele...

Страница 24: ...lenoid wires 3 11 Remove the flow valve and switch assembly 3 12 Refit the components in reverse order Make sure that the electrical wires are installed in the correct positions Flow Valve and Switch...

Страница 25: ...sition 4 6 Carefully pull the flow valve and switch assembly and the heater tank away from thecase Makesurethatyoueasetheinletconnectorassemblyofftheinletsupply pipe 4 7 Make a note of the positions o...

Страница 26: ...ions 5 Thermal Switch Removal and Installation WARNING Isolate the electrical and water supplies before removing the cover Mains electricity connections are exposed when the cover is removed 5 1 Remov...

Страница 27: ...ctrical wires are installed in the correct positions 6 Inlet Filter Replacement WARNING Isolate the electrical and water supplies before removing the cover Mains electricity connections are exposed wh...

Страница 28: ...ction Cause Remedy No water or very low flow rate Handset sprayplate blocked Remove clean Refer to Maintenance in the I O M guide for the fittings Incoming water supply stop valves or appliance isolat...

Страница 29: ...ming water supply stopcock and or appliance isolating valve turned fully on If fault still persists contact your installer Unable to select a cool enough shower during summer months Due to the rise in...

Страница 30: ...41649 Low Flow Neon Assembly 41650 Power On Neon Assembly 41651 SolenoidCoil 41652 OutletConnector 41749 Terminal Block Assembly7 5 8 5kW 41750 Flow Valve Assembly 41751 Switching Assembly 41921 Heate...

Страница 31: ...w Temperature Stop Start 2 Mira Sprint Spare Parts Diagram 416 41 419 23 419 22 419 21 416 43 419 27 416 48 416 51 417 50 872 01 416 49 416 50 416 38 872 28 416 47 419 28 417 49 419 25 416 52 A A A B...

Страница 32: ...BS EN ISO 9001 1994 Reg No FM 14648 Mira is a registered trade mark of subsidiaries of Caradon Mira Limited Thecompanyreservestherighttoalterproduct specifications without notice Guarantee Caradon Pl...

Отзывы: