![Mira Mira Activate Ceiling Fed (High Pressure) 1.1903.086 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/mira/mira-activate-ceiling-fed-high-pressure-1-1903-086/mira-activate-ceiling-fed-high-pressure-1-1903-086_installation-and-user-manual_1804958030.webp)
30
Ceiling Fed
Note: Trim the pipework back to the required depth from the ceiling surface.
Remove all burrs and sharp edges.
1
B.
29 - 48 mm
15 mm
copper pipe
Noggin
Choose desired length of arm and cut neatly using a hack saw or a 22 mm pipe slice
fitted with a stainless steel cutting blade. Remove all burrs and sharp edges.
2
Cut here for ceiling fed
Shower Arm