Mira Mira Activate Ceiling Fed (High Pressure) 1.1903.086 Скачать руководство пользователя страница 1

Mira Activate

Digital Shower

Installation and User Guide

Please leave these instructions with the user

1399980

Содержание Mira Activate Ceiling Fed (High Pressure) 1.1903.086

Страница 1: ...Mira Activate Digital Shower Installation and User Guide Please leave these instructions with the user 1399980...

Страница 2: ...portant Safety Information 4 Pack Contents 6 Guarantee 10 Recommended Usage 10 Products Covered 10 Specifications 11 Suitable Plumbing Installations 13 Showering Maximum Flow Rate 15 Installation Sche...

Страница 3: ...any copper pipework ensure supplementary bonding is provided in accordance with the wiring regulations 6 A 30mA Residual Current Device RCD must be included in the electrical circuit This may be part...

Страница 4: ...Isolate electrical and water supplies to the product and contact Kohler Mira Ltd 13 Make sure that you fully understand how to operate this shower and make sure that it is properly maintained in acco...

Страница 5: ...a minimum air gap of 25mm between the handshower and the spill over level of any bath shower tray or basin There must be a minimum distance of 30mm between the handshower and the spill over level of...

Страница 6: ...er of outlets 3 x Wall Plugs 3 x Fixing Screws 2 x Pozi Screws 3 5 x 12mm 2 x Fixing Feet 2 x Fixing Feet 2 x Push Fit Isolators 1 2 x Outlet Connector Depending on number of outlets 3 x Wall Plugs 3...

Страница 7: ...wer Fitting 1 x Elbow q 4 x Wall Plugs q 4 x Fixing Screws q 1 x Slide Bar Assembly q 1 x User Controller fitted q 2 x Wall Spacers 4 Long Fixing Screws Optional Fitment q 1 x Hose q 2 x Rubber Washer...

Страница 8: ...Cable q 2 x Locking Screw q 1 x Slide Bar Assembly q 4 x Wall Plugs q 2 x Wall Plugs q 4 x Fixing Screws q 1 x Hose q 2 x Rubber Washers q 2 x Fixing Screws q 1 x User Controller q 2 x Mounting Bracke...

Страница 9: ...Deluge Overhead q 1 x Shower Arm q Note For rear fed choose the length of the shower arm and cut off straight end For ceiling fed choose the length of the shower arm and cut off bent end using a 22 mm...

Страница 10: ...r from the date of purchase Your guarantee is only valid if you follow the guidance within this installation and user guide including the Cleaning and Maintenance section Products Covered Domestic Lig...

Страница 11: ...ndard TMV 2 HP BS EN 1111 Type 2 Maximum Static Pressure 1000 kPa 10 bar Maximum Maintained Pressure 500 kPa 5 bar Minimum Maintained Pressure 100 kPa 1 bar Supply Pressure Differential Nominally equa...

Страница 12: ...e 1 kPa 0 01 bar 0 10m Supply Pressure Differential Nominally equal Temperatures Maximum Temperature setting range 35 C 48 C Factory Preset 45 C Minimum Temperature Thermostatic control down to 30 C F...

Страница 13: ...ty systems This includes mixed gravity and mains pressure e g gravity hot and mains cold Doing so will invalidate the warranty and potentially cause product and property damage Use of Warm up Feature...

Страница 14: ...ter cylinder providing nominally equal pressures Pipework layouts and connections must be such that other draw offs will not effect water supplies to the shower shared supplies may lead to airlocking...

Страница 15: ...te If supplied by a pressurised unvented system it maybe permissible to increase the outlet flow rate by use of the Mira Showers app if so desired Gravity System A gravity fed hot water cylinder has a...

Страница 16: ...16 Installation Schematic Max Cable length 9 8m Max Cable length 9 8m...

Страница 17: ...installations where air locking could occur Cold water cisterns should hold no less than 230 litres and hot water cylinders no less than 210 litres gravity system only To eliminate pipe debris it is e...

Страница 18: ...ine or zone strainers will reduce the need to remove debris at the digital mixing valve The recommended maximum mesh aperture dimension for such strainers is 0 5mm Pipework must be rigidly supported a...

Страница 19: ...r M a x W o rk in g P re s s u re 5 0 0 k P a 5 B a r M in P re s s u re 1 0 0 k P a 1 B a r A m b ie n t T e m p 5 5 0 C M a x In le t S u p p ly T e m p 6 5 C P ro d u c t C o d e N 9 0 A 1 2 V 3 2...

Страница 20: ...s must be installed to both inlets supplied and it is recommended to fit isolators on the outlet close to the digital mixing valve for ease of maintenance Note The direction of arrow on isolation valv...

Страница 21: ...le to the digital mixing valve Caution Before any electrical adjustment is attempted the electricity supply must be turned off at the mains switch Electrical installation may only be carried out by a...

Страница 22: ...te If the ceiling height is over 2 4m 8ft a riser rail extension kit will be required Contact our Customer Service department to purchase a 550 mm riser rail extension kit Ceiling Fittings Extension K...

Страница 23: ...lied elbow to connect to the digital mixing valve 6 Elbow Position the slide bar assembly against the bathroom wall and secure using the supplied fixing screws Ensure that the shrouds are facing the c...

Страница 24: ...e handset Note DO NOT fit the handshower until after pipework has been fully flushed through Refer to Commissioning 9 Flow Regulator Hose Washer Top View Connect user controller cable to digital mixin...

Страница 25: ...mm 90 Drill the fixing holes and fit the wall plugs Caution Be aware of hidden pipes or cables Assemble the retaining disc collet seal retainer and small o ring on to the pipe Slide over bracket and...

Страница 26: ...de bar and position the slide bar assembly against bathroom wall in desired position and mark the fixing holes for both brackets Carefully remove the slide bar assembly and tighten the screw on the ba...

Страница 27: ...and secure with the wall screws Note Check for vertical alignment before tightening The mounting brackets are slotted to aid alignment Then fully tighten 520 830 mm Secure the slide bar supports using...

Страница 28: ...d wall surface Remove all burrs and sharp edges 1 Choose desired length of arm and cut neatly using a hack saw or a 22 mm pipe slice fitted with a stainless steel cutting blade Remove all burrs and sh...

Страница 29: ...o ring on to the pipe Slide over the bracket and secure with 4x screws supplied Slide the shroud nut and olive over cut end of the showering arm Insert cut end of showering arm in to the bracket and...

Страница 30: ...ng surface Remove all burrs and sharp edges 1 B 29 48 mm 15 mm copper pipe Noggin Choose desired length of arm and cut neatly using a hack saw or a 22 mm pipe slice fitted with a stainless steel cutti...

Страница 31: ...e overhead Note Alternative longer screws No 8 countersink might be required to ensure engagement with noggins in ceiling Do not screw directly in to plasterboard Pilot Hole Shower Arm Shroud Back Nut...

Страница 32: ...flat surface the controller must not cover any grout lines Caution The user controller cable is max 9 8m in length When positioning the user control ensure the cable can reach Using a suitable drill...

Страница 33: ...e inserting the wall plugs Fit the backplate to the wall in the orientation shown using the fixing screws supplied Tighten by hand do not over tighten 3 Loosen the screw and remove the lid from the di...

Страница 34: ...d press down on the bottom button as you install in position 6 7 41 41 41 41 Top View Connect the user controller cable to digital mixing valve connection port 1 and route cable to the user controller...

Страница 35: ...The digital mixing valve will power and perform a self check where the LED will indicate a RED light initially and will then change to BLUE light after a few seconds Note If the LED does not turn to...

Страница 36: ...36 Start the shower by pressing the outlet icon buttons 3 Adjust the temperature by rotating the bezel 4 Adjust the flow by pressing the flow icon and then rotating the bezel 5 45 45 45...

Страница 37: ...ns pressure system Ensure product is installed in a recommended orientation Ensure pipework is completely free of airlocks dead legs Ensure pipework is flushed isolators are turned on Ensure supplies...

Страница 38: ...LED Commissioning Required Thecontrollerwillindicatecommissioning is required Ensure the checklist is completed and initiate commissioning by pressing Start Do not leave the product unobserved during...

Страница 39: ...s complete Press Done to move on Failed Commissioning If commissioning has failed the product will indicate this Review the installation and retry Recommissioning If recommissioning is required at any...

Страница 40: ...ow 8 l min Cool temperature 38 degrees 5 minute timer Handset on saturate spray Wind down Low flow 8 l min Medium temperature 39 degrees 10 minute timer Overhead only 45 Select Post workout Eco Wake u...

Страница 41: ...inimum flow rate High pressure valve 4 16 lpm Low pressure valve 6 12 lpm Max temp Maximum temperature set point 30 48 Warm Up Mode Enables warm up and delayed start On Off Brightness Display and LED...

Страница 42: ...ing of the user The Bluetooth word mark and logos are registered trademarks owned by the Bluetooth SIG Inc and any use of such marks by Kohler Mira Ltd is under license Other trademarks and trade name...

Страница 43: ...nt 1 2 3 Accessories Replacing an Accessory Bezel Product Product Code Mira Activate Accessory Bezel Matt Black 2 1903 094 Mira Activate Accessory Bezel Brushed Nickel 2 1903 095 Mira Activate Accesso...

Страница 44: ...e displayed on the controller You will need to download the Mira Showers app for full diagnosis and error functionality If you have an error code not listed below or if the errors continue to occur af...

Страница 45: ...customer services team 66 User Interface has lost communications with the valve Check the connection cable is intact and plugged into the valve securely Power off the product for 30 seconds or reset...

Страница 46: ...remove the controller and check the connector to the extension lead is fully inserted and not damaged or wet 5 Contact Mira Customer Service Team if none of the above resolved the issue 1 Check there...

Страница 47: ...above resolved the issue isolate the water and power supply and contact Mira Customer Service Team 1 Combi Boiler fed products Check the hot water supply is hot enough when the shower is in use Combi...

Страница 48: ...are within specification The shower may turn off if these are out of specification Tip Use the Mira Showers app to check the temperature of the hot water inlet 7 If none of the above resolved the issu...

Страница 49: ...ee from limescale will ensure that your shower and showerhead continue to perform to their maximum A blocked showerhead can restrict the flow rate and may cause damage to your shower Use your thumb or...

Страница 50: ...valve cartridges Note Running your product without inlet filters can cause valve damage and will invalidate your product guarantee Isolate the electrical and water supplies to the digital mixing valve...

Страница 51: ...duct should not be disposed of with your general household waste When this product has reached the end of its serviceable life please take it to a recognised WEEE Waste Electrical and Electronic Equip...

Страница 52: ...extend the original expiry date The guarantee on any replacement parts or product ends at the original expiry date For shower fittings or consumable items we reserve the right to supply replacement p...

Отзывы: