Commissioning
Before carrying out the commissioning procedure install the Shower Fittings,
refer to the Shower Fittings Installation and User Guide.
If you are unsure how an electric shower works, please read through the section
“User Instructions”
before continuing.
Turn control to full cold.
Turn the water supply
fully on.
Check for water leaks.
Set control to ‘I’.
Switch on electrical supply.
Press the ‘Start/Stop’
button.
Water will be at full force
and at a cool temperature.
Turn the control slowly.
Temperature remains cool
and flow is reduced
Electrical supply is turned
off at the mains.