![Mira 1.1532.353 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/mira/1-1532-353/1-1532-353_installation-and-user-manual_1805006019.webp)
19
COMMISSIONING
The unit
must not
be run dry. Before proceeding any further with the installation the
shower unit must be commissioned.
1.
Connect the flexible hose to the outlet
of the shower unit.
Caution!
Do not over tighten.
2.
Turn on the water supplies and check
for leaks.
3.
Switch on the electrical supply.
4.
Tu r n t h e o u t e r f l o w c o n t r o l
anticlockwise
to full flow.
5.
Rotate the inner temperature control
anticlockwise to check the hot supply
and clockwise to check the cold
supply.
6.
Turn the flow control
clockwise
to the
OFF
position.
7.
T h e s h o w e r u n i t i s n o w
commissioned.
Hose Washer
Hose
Outer Flow Control
Maximum
Flow Position
Outer Flow Control
OFF Position
Inner Temperature
Control
Temperature Indicator
Cooler
Warmer