5. Usage
MiR Charge 24V Operating Guide (en) 06/2020 - v.3.1 ©Copyright 2017-2020: Mobile Industrial Robots A/S.
31
6.
For the
Relative move
action, under
X
, change the value to
-2
. This will make the robot
drive two meters backward after charging.
7.
The mission is now ready. Select
Save
to save your mission.
The mission can also be inserted in other missions. In that case, the
Relative
move
action is unnecessary.
Testing the mission
To test that the robot executes the mission correctly, you can try running the mission.
NOTICE
Always test missions without payload to minimize potential hazards.