
iii.
Ensure level switches are oriented properly as shown in Figure 3.
Confirm that the level switch at the top of the tank is labeled ‘High’ and the connector near the
bottom of the tank is labeled ‘Low’.
5)
Connect Level Switches
Connect the Level Switch Cable assembly to the RIO Zuni OSG by matching the connectors.
6)
Install Hydrogen Venting
Install the hydrogen vent strainer as described in the Hydrogen Safety White Paper.
MIOX RIO Zuni™ Oxidant Tank Manual
P/N: 102-00115-C
Page 8