Level Switch Assembly 

The two level switches of the level switch assembly mount through the oxidant tank wall and in the 
orientation shown in Figure 3.  

When installing the level switches in to the oxidant tank, the switch nearer the top of the tank should be 
labeled ‘High’ and the switch nearer the bottom of the tank should be labeled ‘Low’. The switches must 
be oriented such that the switch closes as the oxidant level rises or it will not function properly. If the 
correct orientation is unclear, refer to the arrow located on the sensor which points in the upward 
direction.  

NOTE: Incorrect level switch connection will prevent the OSG from operating properly. 

 

Figure 3: Diagram showing installation of level switch into tank wall 

Installing the Oxidant Tank 

1)

 

Position the Oxidant Tank 
Place the Oxidant Tank in a location no more than 10 ft (3m) away from the OSG and near an 
external wall for venting. 
 

2)

 

Install Drop Tube 
If an oxidant tank was purchased from MIOX, connect the loose portion of the drop tube 
assembly that is located inside the tank to the opposite union half and tighten in place so that 
the drop tube is facing vertically towards the bottom of the tank. 
 

3)

 

Connect Oxidant Outlet of OSG 
Connect the oxidant outlet from the RIO Zuni OSG to the oxidant inlet of the oxidant tank using 
the 3/8” I.D. vinyl tubing supplied with the OSG’s standard parts kit. Secure the connections with 
the 5/8” hose clamps, also provided in the Standard Parts Kit. 
 

4)

 

Install Level Switches 
Install the level switches in the side of the tank. 

i.

 

Follow diagram in Figure 3. The nut should be tightened no more than 2 ft-lbs (2.6 Nm). 

ii.

 

The gasket will deform and sandwich the tank wall. 

MIOX RIO Zuni™ Oxidant Tank Manual 

P/N: 102-00115-C 

Page 7 

Содержание RIO ZUNI

Страница 1: ...RIO Zuni Oxidant Tank Kit Installation Operation and Maintenance Manual MIOX RIO Zuni Oxidant Tank Manual P N 102 00115 C Page 1 ...

Страница 2: ...ns 4 INSTALLATION AND STARTUP 6 What you need 6 Tools for Install 6 Installation Location Requirements 6 Connections 6 Plumbing Connections 6 Hydrogen Vents 6 Level Switch Assembly 7 Installing the Oxidant Tank 7 OPERATION AND MAINTENANCE 9 MIOX RIO Zuni Oxidant Tank Manual P N 102 00115 C Page 2 ...

Страница 3: ...conjunction with an oxidant storage tank An oxidant tank with a drop tube assembly separates the mixture of mixed oxidant solution and hydrogen gas which is generated by the OSG vents the hydrogen gas to a safe location and stores the oxidant for use The oxidant tank also holds the level switches which control the operational mode of the RIO Zuni OSG The RIO Zuni Oxidant Tank Kit is a product opti...

Страница 4: ...ort acts as a safety measure in the event that the level switching fails preventing Mixed Oxidant Solution from flowing back into the OSG Drop Tube Assembly The drop tube assembly separates hydrogen gas from the mixed oxidant solution Tank Hydrogen Vent The tank hydrogen vent acts as a secondary vent for hydrogen gas generated during the electrolytic process Failure to provide appropriate hydrogen...

Страница 5: ...nt tank showing all necessary components installed in the tank Tank Hydrogen Vent Drop Tube Assembly Tank Overflow Port Oxidant Outlet Oxidant Inlet Level Switch Cable Assembly MIOX RIO Zuni Oxidant Tank Manual P N 102 00115 C Page 5 ...

Страница 6: ... vent into a specific location are in the Hydrogen Safety White Paper Installation Location Requirements MIOX recommends placing the oxidant tank near an external wall for ease of hydrogen venting and no further than 10 ft 3m away from the OSG see Hydrogen Safety White Paper for details Connections There are three types of connections on an oxidant tank plumbing vents and level switch connections ...

Страница 7: ...ion the Oxidant Tank Place the Oxidant Tank in a location no more than 10 ft 3m away from the OSG and near an external wall for venting 2 Install Drop Tube If an oxidant tank was purchased from MIOX connect the loose portion of the drop tube assembly that is located inside the tank to the opposite union half and tighten in place so that the drop tube is facing vertically towards the bottom of the ...

Страница 8: ...and the connector near the bottom of the tank is labeled Low 5 Connect Level Switches Connect the Level Switch Cable assembly to the RIO Zuni OSG by matching the connectors 6 Install Hydrogen Venting Install the hydrogen vent strainer as described in the Hydrogen Safety White Paper MIOX RIO Zuni Oxidant Tank Manual P N 102 00115 C Page 8 ...

Страница 9: ...TENANCE Once installed the RIO Zuni Oxidant Tank should require no regular maintenance apart from periodic inspection for leaks or changes in the hydrogen venting MIOX RIO Zuni Oxidant Tank Manual P N 102 00115 C Page 9 ...

Отзывы: