INSPECTION
Carefully unpack and inspect your
SCV Rider Scrubber
for shipping damage. Follow unpacking
instructions on shipping pallet. Each unit has been tested and thoroughly inspected before shipment. Any
damage is the responsibility of the delivery carrier who should be notified immediately.
ELECTRICAL
This machine is battery operated and designed to operate on 36 volts DC (6) 6-volt batteries.
BATTERIES
The recommended batteries are rated 370Ah (Minuteman P/N 956715).
We do not recommend mixing AMP hour capacities. Any alternate battery sets can be used if they equal
physical size and capacity. See page 13 for service and installation.
OPERATOR RESPONSIBILITY
Read this manual carefully before operating this machine.
The operator is responsible in taking care of the daily maintenance and check ups of the machine to keep
it in good working condition. The operator must inform the service mechanic or supervisor when the
scheduled maintenance intervals are required as stated in the
MAINTENANCE
section of this manual.
Before starting familiarize yourself with the machine and its controls (see “Machine Overview, Front”,
“Machine Overview, Rear”, “Operator Compartment”, “Control Console” diagrams).
MACHINE COMPONENTS
FRONT
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
Front drive wheel
Side squeegee
Headlights
Accelerator pedal
Tilt-wheel lever
Steering wheel
Operator’s seat
Recovery tank lid
Recovery tank
Control console
Directional switch
Safety latch
Battery compartment
Solution tank
Electrical panel
Parking brake
Rear Squeegee
Rear wheel
Scrub deck
1
Содержание SCV28
Страница 1: ...SCV 28 32 RIDER SCRUBBER OPERATION SERVICE PARTS CARE ...
Страница 3: ...3 ...
Страница 31: ...EXPLODED VIEWS MAIN ASSEMBLY I 25 ...
Страница 32: ...26 ...
Страница 33: ...MAIN ASSEMBLY II 27 ...
Страница 34: ...28 ...
Страница 35: ...MAINFRAME ASSEMBLY I 29 ...
Страница 36: ...MAINFRAME ASSEMBLY II 30 ...
Страница 37: ...31 ...
Страница 38: ...FRONT DRIVE ASSEMBLY 32 ...
Страница 39: ...33 ...
Страница 40: ...STEERING ASSEMBLY 34 ...
Страница 41: ...35 ...
Страница 42: ...LCD HOUSING ASSEMBLY 36 ...
Страница 43: ...SOLUTION TANK ASSEMBLY 37 ...
Страница 44: ...38 ...
Страница 45: ...ELECTRICAL PANEL ASSEMBLY 39 ...
Страница 46: ...CONSOLE ASSEMBLY 40 ...
Страница 47: ...RECOVERY TANK ASSEMBLY I 41 ...
Страница 48: ...42 ...
Страница 49: ...RECOVERY TANK II 43 ...
Страница 50: ...DIVERTER ASSEMBLY 44 ...
Страница 51: ...BATTERY BOX ASSEMBLY 45 ...
Страница 52: ...PUMP ASSEMBLY 46 ...
Страница 53: ...47 ...
Страница 54: ...REAR AXLE ASSEMBLY 48 ...
Страница 55: ...SQUEEGEE MECHANISM ASSEMBLY 49 ...
Страница 56: ...REAR SQUEEGEE ASSEMBLY 28 50 ...
Страница 57: ...51 ...
Страница 58: ...REAR SQUEEGEE ASSEMBLY 32 52 ...
Страница 59: ...53 ...
Страница 60: ...28 CYLINDRICAL SCRUB DECK ASSEMBLY 54 ...
Страница 61: ...55 ...
Страница 62: ...28 DISC SCRUB DECK ASSEMBLY 56 ...
Страница 63: ...57 ...
Страница 64: ...32 CYLINDRICAL SCRUB DECK ASSEMBLY 58 ...
Страница 65: ...59 ...
Страница 66: ...32 DISC SCRUB DECK ASSEMBLY 60 ...
Страница 67: ...61 ...
Страница 68: ...CYLINDRICAL DECK AND SIDE SQUEEGEE MOUNTING 62 ...
Страница 69: ...63 ...
Страница 70: ...DISC SCRUBDECK AND SIDE SQUEEGEE MOUNTING 64 ...
Страница 71: ...65 ...
Страница 72: ...28 SIDE SQUEEGEE RIGHT SIDE 66 ...
Страница 73: ...28 SIDE SQUEEGEE LEFT SIDE 67 ...
Страница 74: ...32 SIDE SQUEEGEE RIGHT SIDE 68 ...
Страница 75: ...32 SIDE SQUEEGEE LEFT SIDE 69 ...
Страница 76: ...OFF AISLE WAND ASSEMBLY 70 ...
Страница 77: ...71 ...
Страница 78: ...PLUMBING DIAGRAM 72 ...
Страница 79: ...WIRING DIAGRAMS POWER WIRING 73 ...
Страница 80: ...INPUTS TO CONTROLLER 74 ...
Страница 81: ...OUTPUTS FROM CONTROLLER 75 ...
Страница 82: ...KEYBOARD WIRING 76 ...
Страница 83: ...MACHINE SCHEMATIC 77 ...
Страница 84: ...1 03 78 ...