PAD INSTALLATION
The red emergency disconnect button and the key switch must be in the OFF position
before installation and the pad driver assembly in the RAISED position. Remove center
cup locking device by gripping on outer edges and turning clockwise. NOTE: Center cup
cannot be pulled out; it must be unscrewed. After removing used pad, place new pad on
pad driver assembly using outer flange of pad driver to center the pad. Push centering
locking cup through the pad and into the pad driver assembly. The ratchet teeth on the
center cup will engage into the pad driver assembly and should be pushed in as far as
possible. If further tightening is needed, rotate the center-locking cup counter-clockwise.
PAD PRESSURE ADJUSTMENTS
The pad pressure adjust knob is located on the top of the control console. Counter-
clockwise rotation increases pad pressure, the opposite rotation decreases. Different
floors, conditions, and pads produce carrying pad load conditions. Ideal burnishing
conditions are maintained while the operating range meter remains in the Green Zone. If
the meter reads in the Red Zone decrease the pad pressure. When the machine is
operated in the Red Zone for a long period of time motor overload will occur and the 70-
amp circuit breaker for the motor will trip. If the motor circuit trips:
1. Check pad condition.
2. Decrease pad pressure.
3. Reset circuit breaker.
7
Содержание Lumina 20 M26036TD
Страница 1: ...Model M26036TD Lumina 20 Traction Drive Battery Burnisher OPERATION SERVICE PARTS CARE...
Страница 2: ...2...
Страница 11: ...EXPLODED VIEWS BASE ASSEMBLY 11...
Страница 13: ...MAINFRAME ASSEMBLY 13...
Страница 15: ...HOUSING ASSEMBLY 15...
Страница 17: ...PAD DRIVER ASSEMBLY 17...
Страница 21: ...CONSOLE ASSEMBLY 21...
Страница 24: ...SCHEMATIC DIAGRAMS 24...
Страница 25: ...25...