5
Installation
5.1
Prior to mounting
5.1.1
Preparing the foundation/substructure
-
The foundation for the mounting kit must be horizontal (use spirit level), flat, and
rigid for the intended loads.
-
The load distribution on the available load cells must be as even as possible to
prevent overload of the individual load cells.
-
The substructure foundations/supporting surfaces for the mounting kits should be at
the same level, and the supporting surfaces of the weighing object (e.g. vessel feet)
must be arranged in parallel.
-
If soft filler layers (e.g. made from rubber or plastic material) are used between the
mounting kit and vessel and/or between the mounting kit and substructure for
vibration dampening or for temperature insulation, a load compensating plate must
be provided between this soft filler layer and the mounting kit to ensure even load
application into the mounting kit.
The design of the insulation and compensation plates depends on the respective
application.
5.2
Tightening torques
The corresponding tightening torques are given in the following table.
Mounting parts
Thread
Tightening torque
Upper plate
M8-A2-70
20 Nm
Lower plate
M8-A2-70
20 Nm
Load cell
M8-A2-80
30 Nm
Recommendation for the washers
of M8 mounting screws:
DIN 7349 (d = 21, h = 4) or DIN 9021 or
ISO 7093-2 (d = 24, h = 2)
5.3
Assembly
5.3.1
Safety instructions
WARNING
The vessel may turn over during mounting.
Securing the vessel against tipping is imperative.
Use an appropriate lifting jack.
Mounting kits PR 97/00, ../01
5 Installation
EN-12
Minebea Intec