PELLERIN MILNOR CORPORATION
• If the grout (after mixing) is too thin (causing it to flow from under the base
pads), install temporary cardboard framing around the pads to retain the grout
until it cures.
2. After the grout has completely cured, raise the machine sufficiently to remove all
temporary blocking and shims. Be careful to avoid disturbing or damaging grout.
3. Lower machine onto grout and tighten all foundation fasteners until they contact the
top of the base plate.
2. Tighten all fasteners evenly, using only one-quarter turn on each fastener before moving to
the next one. While tightening, frequently skip from front to back and right to left to insure
uniform tension. After tightening all fasteners, check each fastener at least twice.
— End of BIRUUI01 —
30
Содержание MWT12E5
Страница 2: ......
Страница 38: ......
Страница 39: ...Service and Maintenance 1 35 ...
Страница 57: ...Drive Assemblies 2 53 ...
Страница 63: ...Bearing Assemblies 3 59 ...
Страница 68: ......
Страница 69: ...Shell and Door Assemblies 4 65 ...
Страница 84: ......
Страница 85: ...Control and Sensing 5 81 ...
Страница 93: ...Chemical Supply 6 89 ...
Страница 101: ...Water and Drain 7 97 ...
Страница 108: ......
Страница 109: ...Dimensional Drawings 8 105 ...
Страница 110: ......
Страница 111: ...107 ...
Страница 112: ...108 ...
Страница 113: ...109 ...
Страница 114: ...110 ...
Страница 115: ...111 ...
Страница 116: ...112 ...
Страница 117: ...113 ...
Страница 118: ......
Страница 119: ...115 ...
Страница 120: ...116 ...
Страница 121: ...117 ...